Practical Management Science
6th Edition
ISBN: 9781337406659
Author: WINSTON, Wayne L.
Publisher: Cengage,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 3, Problem 38P
a)
Summary Introduction
To determine: The way the company can minimize the cost of meeting the month’s requirement.
Introduction: In linear programming, the unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints, then it is said to be an unfeasible solution.
b)
Summary Introduction
To investigate: The effect on ending inventory during the four-quarter period of systematic changes in the unit holding cost.
Introduction: In linear programming, the unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints, then it is said to be an unfeasible solution.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
A company has one machine which can be used to make product Alpha and product Beta.
Each unit of product Alpha requires 45 minutes of machine time, while
each unit of product Beta requires 37 minutes of machine time.
The machine can be used for 8 hours per day and 5 days per week.
Next week the company will produce 23 units of product Alpha.
After completing the production of Alpha, the company will produce product Beta.
How many units of product Beta can be produced next week?
Use at least 4 decimals.You must showm your calculation steps and brief explanation on your Excel spreadsheets.
A roller coaster is being designed for a new theme park. Two "trains" are on the track
at any given time. One train is being unloaded/reloaded while the other is moving
along the track. The track itself takes 10 minutes to complete. The train being loaded
should depart before the arriving train is no closer than one minute away.
Each car of a train accommodates four people. Loading a car is estimated to take 6
seconds per passenger. Unloading is estimated to take 6 seconds per passenger.
Suppose that (unlike actual roller coasters), only one car can be loaded or unloaded
at a time. Unloading can NOT occur at the same time as loading.
In order to maximize the number of potential passengers, how many cars should the
train be made up of? Round your answer to the nearest whole car.
FRUIT COMPUTER COMPANY
Fruit Computer Company manufactures memory chips in batches of ten chips. From past experience, Fruit knows that 80% of all batches contain 10% (1 out of 10) defective chips, and 20% of all batches contain 50% (5 out of 10) defective chips. If a good (that is, 10% defective) batch of chips is sent to the next stage of production, processing costs of $4000 are incurred, and if a bad batch (50% defective) is sent on to the next stage of production, processing costs of $16000 are incurred. Fruit also has the alternative of reworking a batch at a cost of $4000. A reworked batch is sure to be a good batch. Alternatively, for a cost of $400, Fruit can test one chip from each batch in an attempt to determine whether the batch is defective.
QUESTIONS
1.Determine a strategy so Fruit can minimize the expected total cost per batch.
2.Compute the EVSI and EVPI.
Chapter 3 Solutions
Practical Management Science
Ch. 3.6 - Prob. 1PCh. 3.6 - Prob. 2PCh. 3.6 - Prob. 3PCh. 3.6 - Prob. 4PCh. 3.6 - Prob. 5PCh. 3.6 - Prob. 6PCh. 3.6 - Prob. 7PCh. 3.6 - Prob. 8PCh. 3.6 - Prob. 9PCh. 3.7 - Prob. 10P
Ch. 3.7 - Prob. 11PCh. 3.7 - Prob. 12PCh. 3.7 - Prob. 13PCh. 3.7 - Prob. 14PCh. 3.7 - Prob. 15PCh. 3.7 - Prob. 16PCh. 3.7 - Prob. 17PCh. 3.8 - The Pigskin Company produces footballs. Pigskin...Ch. 3.8 - The Pigskin Company produces footballs. Pigskin...Ch. 3.8 - The Pigskin Company produces footballs. Pigskin...Ch. 3.8 - Prob. 21PCh. 3.8 - Prob. 22PCh. 3.8 - Prob. 23PCh. 3.8 - Prob. 24PCh. 3 - Prob. 25PCh. 3 - Prob. 26PCh. 3 - Prob. 27PCh. 3 - Prob. 28PCh. 3 - Prob. 29PCh. 3 - Prob. 30PCh. 3 - Prob. 31PCh. 3 - Prob. 32PCh. 3 - Prob. 33PCh. 3 - Prob. 34PCh. 3 - Prob. 35PCh. 3 - Prob. 36PCh. 3 - Prob. 37PCh. 3 - Prob. 38PCh. 3 - Prob. 39PCh. 3 - Prob. 40PCh. 3 - Prob. 41PCh. 3 - Prob. 42PCh. 3 - Prob. 43PCh. 3 - Prob. 44PCh. 3 - Prob. 45PCh. 3 - Prob. 46PCh. 3 - Prob. 47PCh. 3 - Prob. 48PCh. 3 - Prob. 49PCh. 3 - Prob. 50PCh. 3 - Prob. 51PCh. 3 - Prob. 52PCh. 3 - Prob. 1C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- fi Auto mobile company manufactures cars and trucks. Each vehicle must be processed in the paint shop and body assembly shop. If the paint shop were only painting trucks, then 80 per day could be painted. If the paint shop were only painting cars, then 120 per day could be painted. If the body shop were only producing cars, then it could process 100 per day. If the body shop were only producing trucks, then it could process 100 per day. Each truck contributes GHS60,000 to profit, and each car contributes GHS40,000 to profit. Use linear programming to determine a daily production schedule that will maximize the company’s profits.arrow_forwardA company makes four products that have the following characteristics: Product A sells for $75 but needs $40 of materials to produce; Product B sells for $90 but needs $65 of materials to produce; Product C sells for $110 but needs $80 of materials to produce; Product D sells for $135 but needs $105 of materials to produce. The processing requirements for each product on each of the four machines are shown in the table. Work centers W, X, Y, and Z are available for 5 days per week, 1 shift per day (8 hrs.) and have no setup time when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product. Each worker is paid $15 per hour and is paid for an entire week, regardless of how much the worker is used. Answer the following…arrow_forwardA machine part to be fabricated may be made from alloy of either of two metals. There is an order for 10,000 units. Metal A costs 3 pesos per kg, while Metal B costs 9 pesos per kg. If Metal A is used, the material per unit weighs 110 grams; for metal B, 30 grams. When metal A is used, 50 units can be produced per hour; for metal B, 80 units per hour. Metal B fabrication requires the aid of a tool costing P1,000, which will be useless after the 10,000 units are finished. The machine operator's wage is P50 per hour. If all other costs are identical, determine which material will be more economical to finish the 10,000-unit order. How much is the total cost difference between the use of metal A and metal B?arrow_forward
- A small firm makes three similar products, which all follow the same three-step process, consisting of milling, inspection, and drilling. Product A requires 12 minutes of milling, 5 minutes forinspection, and 10 minutes of drilling per unit; product B requires 10 minutes of milling, 4 minutesfor inspection, and 8 minutes of drilling per unit; and product C requires 8 minutes of milling, 4minutes for inspection, and 16 minutes of drilling. The department has 20 hours available duringthe next period for milling, 15 hours for inspection, and 24 hours for drilling. Product A contributes$2.40 per unit to profit, product B contributes $2.50 per unit, and product C contributes $3.00 perunit. Determine the optimal mix of products in terms of maximizing contribution to profits for theperiod. Then, find the range of optimality for the profit coefficient of each variable.arrow_forwardYou work for a small shipping company and warehouse. The owners have decided to update the software used for tracking, shipping, receiving, and inventory. Fifteen computers need to be updated. Hours of operation are 7 a.m. to 7 p.m. Monday through Saturday. Each computer must be updated manually by one of two trained employees, both of whom must be borrowed from other managers. The update procedure consumes 4 hours of the updater's time and generates an additional 1.5 hours of computer downtime. The work must be performed at a central loading station, away from the current location of the computer. How does the project portfolio management approach lead to enhanced strategic management for an organization and give an example how you woulduse this in a work place?arrow_forwardAccording to the XYZ Apartment Rental Company ER diagram, which of the following is true? Each building must have more than one builder Each building must have multiple apartments Each building must have at least 8 apartments Each building must have more than 2 apartments Answer: ____arrow_forward
- A company that operated 10 hours a day manufactures two products on three sequential processes. The following table summarizes the data for the problem: Product Process 1 10 Process 2 20 Process 3 8 10 Unit Profit 20 30 Which of the following is the most appropriate representation for variables x and y for the given situation? x is the # of units of Product 1 to be procured; y is the # of units of Product 2 to be procured. x is the # of units of Product 1 to be stored; y is the # of units of Product 2 to be stored x is the # of units of Product 1 to be delivered, y is the # of units of Product 2 to be delivered. x is the # of units of Product 1 to be produced; y is the # of units of Product 2 to be produced. minutesarrow_forwardAn experiment that involves learning in animals requires placing white mice and rabbits into separate, controlled environments: environment I and environment II. The maximum amount of time available in environment I is 420 minutes, and the maximum amount of time available in environment II is 624 minutes. The white mice must spend 10 minutes in environment I and 24 minutes in environment II, and the rabbits must spend 12 minutes in environment I and 16 minutes in environment II. (a) Write a system of inequalities that describes the constraints on the number of each type of animal used in the experiment. (Let x represent the number of mice, and let y represent the number of rabbits.) environment I time constraint environment II time constraint x ≥ 0 experiment constraint, mice y ≥ 0 experiment constraint, rabbits (b) Graph the solution of the system of inequalities and find the corners of the solution region.arrow_forwardPlease do not give solution in image format thanku Let xi = 1 if Project i is selected, i = 1,2,3,4,5; and 0 otherwise: Which answer below indicates that if Project 2 is selected, then Project 4 must be selected? Group of answer choices None of the above x2 + x4 = 1 x2 + x4 ≤ 1 x4 ≤ x2 x2 ≤ x4arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,