Chapter 6.6, Problem 36P
Summary Introduction
To solve: The model to minimize the total inches of waste.
Introduction: The variation between the present value of the
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
bama pie company's assembly line operations (the assembly line operates for six hundred minutes per day) comprise of eleven tasks, with the longest task time being 2.4 minutes and the shortest task time being 0.4 minutes; the sum of the task times is eighteen minutes. the firm is working on balancing its assembly line operations. the firm needs to produce 200 pies per day; to achieve this, the firm calculates the required cycle time as ---- minutes?
During an eight-hour shift, 750 non-defective parts are desired as a result of a manufacturing operation. The default operation time is 15 minutes. As the operators of machine are inexperienced, the actual time they take to perform the operation is 20 minutes, and, on average, a fifth of the parts that start to be manufactured are lost. Assuming that each one of the machines used in this operation will not be available for one hour in each shift, determine the number of machines needed.
A manufacturing plant produces a product 'A' that requires one unit of 'B' and ½ unit of 'C'. Each unit of 'B' is comprised of one unit of 'D', two units of 'E', and one unit of 'F'. Each unit of 'C' requires ½ unit of 'G' and three units of 'H'. The manufacturing lead times for the components are as follows: 'A' - two weeks, 'B' - one week, 'C' - two weeks, 'D' - two weeks, 'E' - three weeks, 'F' - one week, 'G' - two weeks, 'H' - one week. There are 20 units in stock for each of these components. 100 units of 'A' are needed for delivery in seven weeks: a) Develop the product structure and indexed bill of materials for the product. b) Create a gross and net requirements plan for the manufacturer of the product.
Chapter 6 Solutions
Practical Management Science
Ch. 6.3 - Prob. 1PCh. 6.3 - Prob. 2PCh. 6.3 - Solve Problem 1 with the extra assumption that the...Ch. 6.3 - Prob. 4PCh. 6.3 - Prob. 5PCh. 6.3 - Prob. 6PCh. 6.3 - Prob. 7PCh. 6.3 - Prob. 8PCh. 6.3 - Prob. 9PCh. 6.3 - Prob. 10P
Ch. 6.4 - Prob. 11PCh. 6.4 - Prob. 12PCh. 6.4 - Prob. 13PCh. 6.4 - Prob. 14PCh. 6.4 - Prob. 15PCh. 6.4 - Prob. 16PCh. 6.4 - Prob. 17PCh. 6.4 - Prob. 18PCh. 6.4 - Prob. 19PCh. 6.4 - Prob. 20PCh. 6.4 - Prob. 21PCh. 6.4 - Prob. 22PCh. 6.4 - Prob. 23PCh. 6.5 - Prob. 24PCh. 6.5 - Prob. 25PCh. 6.5 - Prob. 26PCh. 6.5 - Prob. 28PCh. 6.5 - Prob. 29PCh. 6.5 - Prob. 30PCh. 6.5 - In the optimal solution to the Green Grass...Ch. 6.5 - Prob. 32PCh. 6.5 - Prob. 33PCh. 6.5 - Prob. 34PCh. 6.5 - Prob. 35PCh. 6.6 - Prob. 36PCh. 6.6 - Prob. 37PCh. 6.6 - Prob. 38PCh. 6 - Prob. 39PCh. 6 - Prob. 40PCh. 6 - Prob. 41PCh. 6 - Prob. 42PCh. 6 - Prob. 43PCh. 6 - Prob. 44PCh. 6 - Prob. 45PCh. 6 - Prob. 46PCh. 6 - Prob. 47PCh. 6 - Prob. 48PCh. 6 - Prob. 49PCh. 6 - Prob. 50PCh. 6 - Prob. 51PCh. 6 - Prob. 52PCh. 6 - Prob. 53PCh. 6 - Prob. 54PCh. 6 - Prob. 55PCh. 6 - Prob. 56PCh. 6 - Prob. 57PCh. 6 - Prob. 58PCh. 6 - Prob. 59PCh. 6 - Prob. 60PCh. 6 - Prob. 61PCh. 6 - Prob. 62PCh. 6 - Prob. 63PCh. 6 - Prob. 64PCh. 6 - Prob. 65PCh. 6 - Prob. 66PCh. 6 - Prob. 67PCh. 6 - Prob. 68PCh. 6 - Prob. 69PCh. 6 - Prob. 70PCh. 6 - Prob. 71PCh. 6 - Prob. 72PCh. 6 - Prob. 73PCh. 6 - Prob. 74PCh. 6 - Prob. 75PCh. 6 - Prob. 76PCh. 6 - Prob. 77PCh. 6 - Prob. 78PCh. 6 - Prob. 79PCh. 6 - Prob. 80PCh. 6 - Prob. 81PCh. 6 - Prob. 82PCh. 6 - Prob. 83PCh. 6 - Prob. 84PCh. 6 - Prob. 85PCh. 6 - Prob. 86PCh. 6 - Prob. 87PCh. 6 - Prob. 88PCh. 6 - Prob. 89PCh. 6 - Prob. 90PCh. 6 - Prob. 91PCh. 6 - Prob. 92PCh. 6 - This problem is based on Motorolas online method...Ch. 6 - Prob. 94PCh. 6 - Prob. 95PCh. 6 - Prob. 96PCh. 6 - Prob. 97PCh. 6 - Prob. 98PCh. 6 - Prob. 99PCh. 6 - Prob. 100PCh. 6 - Prob. 1CCh. 6 - Prob. 2CCh. 6 - Prob. 3.1CCh. 6 - Prob. 3.2CCh. 6 - Prob. 3.3CCh. 6 - Prob. 3.4CCh. 6 - Prob. 3.5CCh. 6 - Prob. 3.6C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Solve the linear programming problem by the method of corners. Maximize P= x + 6y subject to x + y s4 2x + y s6 x 2 0, y 20 The maximum is P = at (x, y) = Need Help? Read Itarrow_forwardfi Auto mobile company manufactures cars and trucks. Each vehicle must be processed in the paint shop and body assembly shop. If the paint shop were only painting trucks, then 80 per day could be painted. If the paint shop were only painting cars, then 120 per day could be painted. If the body shop were only producing cars, then it could process 100 per day. If the body shop were only producing trucks, then it could process 100 per day. Each truck contributes GHS60,000 to profit, and each car contributes GHS40,000 to profit. Use linear programming to determine a daily production schedule that will maximize the company’s profits.arrow_forwardA custom motor cycle shop is experiencing high demand from its customers for its services. The owner performs all tasks relating to customization. Assume each customer brings one motor cycle for customization. The owner needs to determine if he needs to add more help to meet customer demand. A week has 40 hours ( maximum amount of time for the owner to work) The maximum number of customizations that can be done per week is 10 bikes ( if there is no wasted time). The following is the data collected from observations for a typical week : Every Friday the shop is cleaned by the owner. This takes 4 hours. - 15 % of the customizations needs rework which takes 50 % more time than regular customization - 10 % of the customers will be called by the owner. This takes 2 hours per customer. Determine OEE. How should the owner handle the business ? Show all formulas used, calculations and results. Do on Blk Bd For the toolbar, press ALT+F10 (PC) or ALT+FN+F10 (Mac).arrow_forward
- Two currently owned machines are being considered for the production of a part. The capital investment associated with the machines is about the same and can be ignored for purposes of this example. The important differences between the machines are their production capacities and their reject rates. Consider the following machine:Machine A:Production rate=250 parts per hourHours available for the operation= 8 hours per dayPercent defective= 5%Machine B:Production rate=290 parts per hourHours available for the operation= 5 hours per dayPercent defective= 12%The material cost is P12 per part, and all defect-free parts produced can be sold for P30 each. (Rejected parts have negligible scrap value.) For either machine, the operator cost is P45.00 per hour and the variable overhead rate for traceable costs is fiver percent of the operator cost per hour.arrow_forwardTyler bakes Cookies (C) and Breads (B) with the help of two ovens in his little bakery. The time taken by Oven A to bake each cookie batch is 14 minutes and the time taken by Oven B is 12 minutes. The time taken by Oven A to bake a batch of bread is 16 minutes and the time taken by Oven B is 17 minutes. Each week both Ovens can be used for 50 hours each to bake Cookies and Breads. The rest of the time is used for baking other products. Moreover, Tyler starts each week with a stock of 25 batches of Cookies and 30 batches of Breads because the Cookies and Breads he produces can be considered to be “fresh” for a maximum of 2 weeks. There is an average weekly demand of 70 batches of Cookies and 50 batches of Breads. For each batch of Cookies, Tyler makes $30 in profit and for each batch of Breads Tyler makes $25 in profit. If there are any “close to losing freshness” goods at the end of the week, Tyler sells them at heavily discounted prices on weekends with a profit of $5 per batch of…arrow_forwardA company produces motor cycle seats. The company has two production lines. The production rate for line one is 50 seats per hour and for line two it is 60 seats per hour. The company has entered into a contract to supply1200 seats daily to another company. Currently, the normal operation period for each line is 8 hours. The production manager 4 | P a g eof the company is trying to determine the best daily operation hours for the two lines. He sets the priorities to achieve his goals as given below:- P1: produce and deliver 1200 seats daily- P2: limit the daily overtime operation hours of line one to 3 hours- P3: Limit the daily overtime operation hours of line two to 4 hours Formulate the problem as a GP model and then solve it by using graphical methodarrow_forward
- Please state and explain whether the statements below are true or false. Operation efficiency affects the # of parts that need to be started in the system to satisfy a fixed quantity of good parts. If a machine is shared between two different operations, the machine fraction is calculated for each operation independently and the sum of the rounded-up fractions provides the number of machines needed.arrow_forwardSuppose that you are a manager in an organization and your staff required laptops for their routine work you have limited budget time and certain specifications required in laptops you have to solve this problem how can you solve this problem in a sequential manner?arrow_forward8-0-0-0-0 10 Raw Material Ship Capacity= units/day Information: The illustration above is an example of a production process, where capacity is given for each operation in the process in units per day. The boxes represent operations in the process. The letters in each box are the names of the operations, and the numbers in each box are that operation's capacity in units per day. In this exercise, assume that market demand is 15 units per day; therefore, the market is not the constraint. 1. Which operation in the process above is the drum?arrow_forward
- The Yum and Yee food truck near the business school serves customers during lunch hour by taking orders and making fresh batches of stir fry. Customers have only one choice during the lunch hour, since the objective is to maximize the number of customers served. Assume that each customer places just one lunch order, and all lunch orders are the same size-one unit of stir-fry. The stir fry cooking works in this manner. First, a batch of orders is cooked in a wok by one person. The cooking depends upon the number of orders in the batch. The time to cook just one order i 6.5 minutes. For each additional order in the batch, it takes 0.5 minutes more to cook. Thus, cooking two orders in a batch takes 7 minutes, cooking three orders takes 7.5 minutes, and so on. The other process is bagging and accepting payments (done by a separate person), which takes 0.90 minutes per order. If Yum and Yee operates with batch sizes of 4 units, what is their process capacity (in orders per minute)? (The…arrow_forwardA product is completed when 18 tasks are done. These tasks are assigned to 6 workstations (each workstation handling several tasks) in an assembly line set up. All workstations work the same amount of time (= cycle time), and move the (partial) product to the next workstation, and repeat this process. The last workstation generates the finished product. We need 1200 units made every day (= 8 hours). If we run this line with a cycle time of 0.3 minutes, what is the most amount of work (in minutes) that can be done on this product? (Give the answer with one decimal place)arrow_forward. A group of students organizes a bake sale in which they sell hundreds of cookies at $1per piece. They set up a table on campus and wait for students to come and purchasetheir cookies. Consider the following variables in this bake sale operation:1. Size of the cookies2. Weather conditions on campus3. Organization of the table4. Number of cookies sold5. Competition from other fund-raisers coinciding on campus6. Amount of advertising and shouting of the students at the bake sale table7. Number of students on campus that dayWhich of these variables is an output variable?a. 3b. 4c. 5d. None of the abovearrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.