Spreadsheet Modeling & Decision Analysis: A Practical Introduction to Business Analytics (MindTap Course List)
8th Edition
ISBN: 9781305947412
Author: Cliff Ragsdale
Publisher: Cengage Learning
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
thumb_up100%
Chapter 3, Problem 17QP
a)
Summary Introduction
To formulate: An linear programming model for the problem.
b)
Summary Introduction
To develop: A spreadsheet model and solve using solver.
c)
Summary Introduction
To identify: The optimal solution.
d)
Summary Introduction
To identify: The number of workers to be assigned to each machine.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
A producer has three products, A, B, and C, which are composed from many of the same raw materials and subassemblies by the same skilled workforce.
Each unit of product A uses 15 units of Raw Material X, one Purge System Subassembly, one Case, one Power Cord, three Labour Hours in the Assembly Department, and one Labour Hour in the Finishing Department.
Each unit of product B uses 10 units of Raw Material X, five units of Raw Material Y, two Purge System Subassemblies, one Case, one Power cord, five Labour Hours in the Assembly Department, and 90 minutes in the Finishing Department.
Each unit of product C uses five units of Raw Material X, 25 units of Raw Material Y, two Purge System Subassemblies, one Case, a Power Cord, seven Labour Hours in the Assembly Department, and Three Labour Hours in the Finishing Department.
Labour between the Assembly and Finishing departments is not transferable, but workers within each department work on any of the three products. There are three…
A producer has three products, A, B, and C, which are composed from many of the same raw materials and subassemblies by the same skilled workforce.
Each unit of product A uses 15 units of Raw Material X, one Purge System Subassembly, one Case, one Power Cord, three Labour Hours in the Assembly Department, and one Labour Hour in the Finishing Department.
Each unit of product B uses 10 units of Raw Material X, five units of Raw Material Y, two Purge System Subassemblies, one Case, one Power cord, five Labour Hours in the Assembly Department, and 90 minutes in the Finishing Department.
Each unit of product C uses five units of Raw Material X, 25 units of Raw Material Y, two Purge System Subassemblies, one Case, a Power Cord, seven Labour Hours in the Assembly Department, and Three Labour Hours in the Finishing Department.
Labour between the Assembly and Finishing departments is not transferable, but workers within each department work on any of the three products. There are three…
Company ZWZ manufactures three products in a serial system; Product XA is manufactured in Stage 1, Product XB in Stage 2, and XC in Stage 3. Product XB has a sales potential in the market; hence, some of it can be sold at the end of Stage 2, and
the remaining can be moved to Stage 3. The third stage produces Product XC, and then delivers it to customers. Two units of Product XA produced in Stage 1 are required for each unit of Product XB in Stage 2. In addition, four units of Product XB
produced in Stage 2 are required for each unit of Product XC in Stage 3.
Stage 1 can only use regular time; however, Stage 2 has the options of using regular time and overtime in manufacturing. On the other hand, Stage 3 has only one alternative, which is subcontracting. The pertinent data are provided below:
Stage 2
Stage 1
11
No overtime
No
subcontracting
No sales
0.07
Unit regular time cost (TL)
Unit overtime cost (TL)
Unit subcontracting cost (TL)
Unit selling price (TL)
Unit processing time (hrs)…
Chapter 3 Solutions
Spreadsheet Modeling & Decision Analysis: A Practical Introduction to Business Analytics (MindTap Course List)
Ch. 3 - Prob. 1QPCh. 3 - Prob. 2QPCh. 3 - Prob. 3QPCh. 3 - Prob. 4QPCh. 3 - Prob. 5QPCh. 3 - Prob. 6QPCh. 3 - Refer to question 19 at the end of Chapter 2....Ch. 3 - Prob. 8QPCh. 3 - Prob. 9QPCh. 3 - Prob. 10QP
Ch. 3 - Prob. 11QPCh. 3 - Prob. 12QPCh. 3 - Prob. 13QPCh. 3 - Prob. 14QPCh. 3 - Prob. 15QPCh. 3 - Prob. 16QPCh. 3 - Prob. 17QPCh. 3 - Tuckered Outfitters plans to market a custom brand...Ch. 3 - Prob. 19QPCh. 3 - Prob. 20QPCh. 3 - Prob. 21QPCh. 3 - Prob. 22QPCh. 3 - Prob. 23QPCh. 3 - Prob. 24QPCh. 3 - Prob. 25QPCh. 3 - Prob. 26QPCh. 3 - A manufacturer of prefabricated homes has decided...Ch. 3 - Prob. 28QPCh. 3 - Prob. 29QPCh. 3 - Prob. 30QPCh. 3 - Prob. 31QPCh. 3 - Prob. 32QPCh. 3 - Prob. 33QPCh. 3 - Prob. 34QPCh. 3 - Prob. 35QPCh. 3 - Prob. 36QPCh. 3 - Prob. 37QPCh. 3 - Prob. 38QPCh. 3 - Prob. 39QPCh. 3 - Prob. 40QPCh. 3 - Prob. 41QPCh. 3 - Prob. 42QPCh. 3 - Prob. 43QPCh. 3 - Prob. 44QPCh. 3 - A natural gas trading company wants to develop an...Ch. 3 - Prob. 46QPCh. 3 - The CFO for Eagle Beach Wear and Gift Shop is in...Ch. 3 - Prob. 48QPCh. 3 - Prob. 1.1CCh. 3 - Prob. 1.2CCh. 3 - Prob. 1.3CCh. 3 - Prob. 1.4CCh. 3 - Prob. 2.1CCh. 3 - Prob. 2.2CCh. 3 - Prob. 2.3CCh. 3 - Prob. 2.4CCh. 3 - Prob. 2.5CCh. 3 - Kelly Jones is a financial analyst for Wolverine...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, management and related others by exploring similar questions and additional content below.Similar questions
- During an eight-hour shift, 750 non-defective parts are desired as a result of a manufacturing operation. The default operation time is 15 minutes. As the operators of machine are inexperienced, the actual time they take to perform the operation is 20 minutes, and, on average, a fifth of the parts that start to be manufactured are lost. Assuming that each one of the machines used in this operation will not be available for one hour in each shift, determine the number of machines needed.arrow_forwardA manufacturing plant produces a product 'A' that requires one unit of 'B' and ½ unit of 'C'. Each unit of 'B' is comprised of one unit of 'D', two units of 'E', and one unit of 'F'. Each unit of 'C' requires ½ unit of 'G' and three units of 'H'. The manufacturing lead times for the components are as follows: 'A' - two weeks, 'B' - one week, 'C' - two weeks, 'D' - two weeks, 'E' - three weeks, 'F' - one week, 'G' - two weeks, 'H' - one week. There are 20 units in stock for each of these components. 100 units of 'A' are needed for delivery in seven weeks: a) Develop the product structure and indexed bill of materials for the product. b) Create a gross and net requirements plan for the manufacturer of the product.arrow_forwardThe Sure To Peal Paint Company stores all its metal compressed gas containers in a warehouse. These long cylindrical metal tanks contain various gases used in manufacturing cans of spray paint. The gas tanks are delivered to the warehouse by truck. Two receiving dock workers unload the containers from the delivery trucks and place them on four wheel trucks. Two materials handlers are responsible for pushing the loaded trucks into the warehouse, unloading the tanks and setting them up on end. The two materials handlers spend a major portion of their day moving loads of the gas tanks into the warehouse and placing them into the proper storage locations. In total, there are five different types of gases that in equal proportion make up 98% of all gas handled. Question: Management would like to identify a better way to handle these gas tanks. How can the handling operation be improved?arrow_forward
- A gold mining area in Lanao contains on average 1 ounce of gold per ton. Two methods of processing are available; method a cost 1.5m per ton and recovers 90% of gold: method b cost 1.3m per ton and recovers 80% of the gold. If gold can be sold for 2.4m per ounce which method is better and by how mucharrow_forwardABC Apple Juice Company produces and markets fresh fruit juice. During the apple harvest season, trucks bring apples from the fields to the process plant during a workday that runs long hours from 7AM. On peak days, approximately 3,000 kg of apples are trucked in per hour. Trucks dump their contents in a holding bin with a storage capacity of 9,000 kg. When the bin is full, incoming trucks must wait until it has sufficient available space. A conveyor moves apples from bin to the processing plant. The plant is configured to process apples at the rate of 2,000 kg per hour. Trucks arrive uniformly between 7:00AM to 5:00PM. Each truck holds about 1,000 kg of apples. The truck drivers are paid at the rate of $10 per hour. As ABC makes fresh juice, it does not store apples. Processing plant starts at 10:00AM and ends when all the apples received during the day have been processed. It takes 2 hours to clean the empty plant that must be kept ready for the next day production. Trucks are owned…arrow_forwardGeorgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and the cost per hour to perform the work are shown here: Cabinetmaker 1 Cabinetmaker 2 Cabinetmaker 3 Hours required to complete all the oak cabinets 50 44 32 Hours required to complete all the cherry cabinets 61 46 34 Hours available 35 25 30 Cost per hour $36 $43 $56 For example, Cabinetmaker 1 estimates that it will take 50 hours to complete all the oak cabinets and 61 hours to complete all the cherry cabinets. However, Cabinetmaker 1 only has 35 hours available for the final…arrow_forward
- c. If Cabinetmaker 1 has additional hours available, would the optimal solution change? If required, round your answers to three decimal places. If your answer is zero, enter "0". Explain. ✓ because Cabinetmaker 1 has dual value Yes ✓ of No -1.84 ✔ ✓ of Therefore, each additional hour of time for cabinetmaker 1 will reduce total cost by $ d. If Cabinetmaker 2 has additional hours available, would the optimal solution change? If required, round your answers to three decimal places. If your answer is zero, enter "0". Use a minus sign to indicate the negative figure. Explain. ✔ because Cabinetmaker 2 has a slack 1.84 ✔ per hour, up to a maximum of 30 X hours. Alternatively, the dual value is 50 ✓ hours. 0.00 ✓ which means that adding one hour to this constraint will decrease total cost by $ 0.00 ✓.arrow_forwardGeorgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and the cost per hour to perform the work are shown here: Cabinetmaker 1 Cabinetmaker 2 Cabinetmaker 3 Hours required to complete all the oak cabinets 47 40 27 Hours required to complete all the cherry cabinets 64 51 36 Hours available 40 30 35 Cost per hour $34 $41 $52 For example, Cabinetmaker 1 estimates it will take 47 hours to complete all the oak cabinets and 64 hours to complete all the cherry cabinets. However, Cabinetmaker 1 only has 40 hours available for the final…arrow_forwardGeorgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and the cost per hour to perform the work are shown here: Cabinetmaker 1 Cabinetmaker 2 Cabinetmaker 3 Hours required to complete all the oak cabinets 50 44 32 Hours required to complete all the cherry cabinets 61 46 34 Hours available 35 25 30 Cost per hour $36 $43 $56 For example, Cabinetmaker 1 estimates that it will take 50 hours to complete all the oak cabinets and 61 hours to complete all the cherry cabinets. However, Cabinetmaker 1 only has 35 hours available for the final…arrow_forward
- Georgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and the cost per hour to perform the work are shown here: Hours required to complete all the oak cabinets Hours required to complete. all the cherry cabinets Hours available Cost per hour Min s.t. 01 Let O₁ O₂ 01 01 For example, Cabinetmaker 1 estimates it will take 50 hours to complete all the oak cabinets and 60 hours to complete all the cherry cabinets. However, Cabinetmaker 1 only has 40 hours available for the final finishing operation. Thus, Cabinetmaker 1 can only complete 40/50 = 0.8, or 80%,…arrow_forwardFormulate but do not solve the problem.The management of Hartman Rent-A-Car has allocated $2.25 million to buy a fleet of new automobiles consisting of compact, intermediate-size, and full-size cars. Compacts cost $18,000 each, intermediate-size cars cost $27,000 each, and full-size cars cost $36,000 each. If Hartman purchases twice as many compacts as intermediate-size cars and the total number of cars to be purchased is 100, determine how many cars of each type will be purchased. (Assume that the entire budget will be used. Let x, y, and z denote the number of compact, intermediate-sized, and full-size cars purchased, respectively.) = 2,250,000 = x = 100arrow_forwardA manufacturing firm has four plants and wants to find the most efficient means of meeting the requirements of its four customers. The relevant information for the plants and customers, along with shipping costs in dollars per unit, are shown in the table below: Customer (requirement) Factory (capacity) Customer 1 (125) Customer 2 (150) Customer 3 (175) Customer 4 (75) A (100) $ 15 $ 10 $ 20 $ 17 B (75) $ 20 $ 12 $ 19 $ 20 C (100) $ 22 $ 20 $ 25 $ 14 D (250) $ 21 $ 15 $ 28 $ 12 How many arcs will the network have?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,