Summary Introduction
To determine: Takt time if match capacity and demand.
Introduction: Takt refers to “musical meter” or “pulse” in German. Takt time is the process duration required in a production system to counterpart the velocity of manufacturing to the request rate. It is once in a while said to be the pulse of a lean production system. It is the greatest measure of time in which an item should be delivered with a specific end goal to fulfill client request.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
What cycle time would match capacity and demand if demand is 120 units a day, there are twoshifts of 480 minutes each, and workers are given three half-hour breaks during each shift, one ofwhich is for lunch or dinner?
A production line has three stations and the first station can process a unit in 10 minutes. The second station has two identical machines, each of which can process a unit in 12 minutes. The third station can process a unit in 8 minutes.
What is the hourly capacity of this production line?
Students are going through a three-step process to obtain their ID cards. Each student will spend 2 minutes at the registration
desk before going to one of three cashiers to pay a fee for the ID card. After that, he/she will visit one of four ID processing
stations to have his/her picture taken and ID card printed. Visits to the cashier and ID processing station take 10 and 20
minutes respectively. If the demand rate is 0.5 student per minute, how long does it take to process 20 students, assuming
the system is full?
Multiple Choice
100 minutes
127 minutes
Chapter 14 Solutions
EBK OPERATIONS MANAGEMENT
Ch. 14.4 - Prob. 1.1RQCh. 14.4 - Prob. 1.2RQCh. 14.4 - Prob. 1.3RQCh. 14.S - Prob. 1DRQCh. 14.S - Prob. 2DRQCh. 14.S - Prob. 3DRQCh. 14.S - Prob. 4DRQCh. 14.S - Prob. 5DRQCh. 14.S - Prob. 6DRQCh. 14.S - Prob. 7DRQ
Ch. 14.S - Prob. 8DRQCh. 14.S - Prob. 9DRQCh. 14.S - Prob. 10DRQCh. 14.S - The probability that equipment used in a hospital...Ch. 14.S - The frequency of breakdown of a machine that...Ch. 14.S - Prob. 3PCh. 14 - Prob. 1DRQCh. 14 - Prob. 2DRQCh. 14 - Prob. 3DRQCh. 14 - Prob. 4DRQCh. 14 - Prob. 5DRQCh. 14 - Prob. 6DRQCh. 14 - Prob. 7DRQCh. 14 - Contrast push and pull methods ofmovi.ttg goods...Ch. 14 - Prob. 9DRQCh. 14 - Prob. 10DRQCh. 14 - Prob. 1TSCh. 14 - Prob. 2TSCh. 14 - Prob. 3TSCh. 14 - Prob. 1CTECh. 14 - Prob. 2CTECh. 14 - Prob. 1PCh. 14 - Prob. 2PCh. 14 - Prob. 3PCh. 14 - Determine the number of cycles per day and the...Ch. 14 - Given this set of daily service operations, and...Ch. 14 - Determine the number of cycles per day and a...Ch. 14 - Compute the takt time for a system where the total...Ch. 14 - Prob. 8PCh. 14 - Prob. 9PCh. 14 - What might Stephanie determine as the best...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- A company producing a standard line and a deluxe line of dishwashers has the following time requirements (in minutes) in departments where either model can be processed. Standard Deluxe Stamping 3 6 Motor Installation 10 10 Wiring 10 15 The standard models contribute $20 each and the deluxe $30 each to profits. Because the company produces other items that share resources used to make the dishwashers, the stamping machine is available only 30 minutes per hour, on average. The motor installation production line has 60 minutes available each hour. There are two lines for wiring, so the time availability is 90 minutes per hour. Write the formulation for this linear program. What are the optimal daily production quantities of each product and the optimal daily profit?arrow_forwardApples are prepared in a process with two resources. The first resource has a capacity of 2.1 apples per minute. The capacity of the second resource is 4.4 apples per minute. Demand for this process is 1.6 apples per minute. What is the cycle process in seconds?arrow_forwardA work cell is required to make 100 computerized diagnostic assemblies (for installation into hybrid automobiles) each day. The cell currently works an eight hour shift, of which seven hours is available for productive work. These assemblies require five operations, with times of 1.5, 1.8, 1.4, 1.5, and 1.9 minutes each. What is takt time for this cell? How many workers will be needed?arrow_forward
- Diners are served in a process with two resources. The first resource has a capacity of 0.9 diners per hour. The capacity of the second resource is 1.1 diners per hour. The first resource has 1 worker and the second resource has 3 workers. What is the labor content (in hours)? round your answer to two decimal pointsarrow_forwardWhat cycle time would match capacity and demand if demand is 173 units a day, there are 2 shift(s) of 458 minutes each, and workers are given three 35-minute breaks during each shift, one of which is for lunch or dinner?arrow_forwardA work center consists of 4 machines working 8 hours a day for a 5-day week. If theutilization is 80% and the efficiency is 90%, what is the rated capacity of the workcenter?arrow_forward
- Abbott Manufacturing produces plastic cases for solar photovoltaic panels and has decided to combine orders from customers to increase work order size, and thereby, make one large production run per model type. Plastic injection molding machines are used to make these parts, and it is time consuming to clean and re-setup the machines between production runs. Each molding machine and operator works one 10-hour shift with a one- hour lunch break and one-half hour for operator breaks. Consolidated Work Orders Model XVT-5 Case Model UYT-3 Case Model KLY-6 Case Work Order Quantity 8,800 panels 8,700 12,400 Setup (Changeover) Time per Work Order (minutes) 86 63 135 Processing Time per Panel (seconds) 2.50 2.22 4.11 What is the total workload (demand) in hours for this work order mix? Round your answer to one decimal place. The total workload is hours. How many machines will it take to do this work in one, two, or three days? Round your answers up to the nearest whole number. To do this work…arrow_forwardAbbott Manufacturing produces plastic cases for solar photovoltaic panels and has decided to combine orders from customers to increase work order size, and thereby, make one large production run per model type. Plastic injection molding machines are used to make these parts, and it is time consuming to clean and re-setup the machines between production runs. Each molding machine and operator works one 10-hour shift with a one-hour lunch break and one-half hour for operator breaks. Consolidated Work Orders Model XVT-5 Case Model UYT-3 Case Model KLY-6 Case Work Order Quantity 9,600 panels 7,900 12,000 Setup (Changeover) Time per Work Order (minutes) 98 160 What is the total workload (demand) in hours for this work order mix? Round your answer to one decimal place. The total workload is hours. How many machines will it take to do this work in one, two, or three days? Round your answers up to the nearest whole number. To do this work in 1 day they need machine(s). machine(s). To do this…arrow_forwardcapacity is determined by the number of machine used? True or False?arrow_forward
- If a production process has a bottleneck cycle time of 48 minutes/item, what is the maximum daily capacity of the system, assuming the company operates two, 8-hour shifts? Enter an integer value.arrow_forwardIn the three-station process depicted in the figure below a product must go through one of the two machines at station 1 (they are parallel) before proceeding to station 2. (hr-hour, min-minutes) Capacity: 4 units/hr Station 1 Machine A Station 2 Station 3 Station 1 Machine B Capacity: Capacity: 12 units/hr 5 units/hr Capacity: 4 units/hr In one hour at most how many products the process can produce? O 5 units/hr 8 units/hr 12 units/hr O None of the abovearrow_forwardMcDonalds has a drive-through window and, during peak lunch times, can handle a maximum of 85 cars per hour with one person taking orders, assembling them, and acting as cashier. The average sale per order is $12.00. A proposal has been made to add two additional workers and divide the tasks among the three. One will take orders, the second will assemble them, and the third will act as a cashier. With this system, it is estimated that 120 cars per hour can be serviced. Use productivity arguments to recommend whether or not to change the current system. Hint: Productivity = revenue/labor dollararrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY