Find the critical path method, ea float.
Q: The slope of HGL will be
A: To find : Slope of HGL.
Q: Describe about Flow Nets and Seepage.
A: Flow net is a graphical representation of two-dimensional steady-state groundwater flow through…
Q: A walkway in Dohat Arad rises 4m on a 40m run. Calculate slope. Whether this walkway will be allowed…
A:
Q: You need to finalise the sewer alignment for asimulated study area. The teacher will bring you to…
A: Sewage refers to wastewater that contains feces, urine, and laundry waste. Sewage is treated in…
Q: Q1) Water is flowing in three side-by-side pipes of diameter (1.8m) each. The Manning's (n) and the…
A:
Q: Write the criteria for the flow based on Reynold number?
A:
Q: A rectangular channel with a bottom slope of 0.0004 is to be built to transport water at a rate of…
A: Given :- A rectangular channel is given Bottom slope of the rectangular channel = 0.0004 Rate of…
Q: 5. In case of bridge greater than 10.7m in height and which canno be inspected from beneath due t…
A: To find: Which is best for inspection
Q: A rectangular channel with a bottom slope of 0.0004 is to be built to transport water at a rate of…
A:
Q: As an Engineer kindly Design a open channel section , such that the flow at any depth in the channel…
A:
Q: At one section of a 300 cm wide rectangular channel, the depth of flow is 180 cm. With a bed of…
A:
Q: 4 KN 2 KN 10 KN
A: Solution
Q: A circalar sewer pipe 1.6 m in diameter is Taid on a slope of 2 m per kilometer. The pipe is made of…
A:
Q: 2. Water flows at a rate of 50 cfs and a depth of 4 feet in a 6-foot wide rectangular channel. The…
A: Depth of the trapezoid channel section will be= 4.031 ft.
Q: What is the ratio of flow rates (Q1/Q2) for an open channel, when only the material of it is changed…
A:
Q: Cite some similarities, and perhaps some dissimilarities,between a weir and a Bernoulli obstruction…
A: The similarities between the Weir plate and Bernoulli obstruction flow meter are: Both the Weir…
Q: Q2- Find the required area of cut/fill (m2) and Calculate the net volumes (m3) between each two…
A:
Q: On a railroad, a -8% grade meets a +0.40% grade at station 2 + 700m whose elevation is 30.00m above…
A: Given data: station 2 + 700m elevation is 30.00m
Q: What do you mean by plume down wash?
A: Plume down wash Downward movement of plumes immediately to the lee of flow obstacles such as…
Q: 8. Estimate the value of wetted area of a circular section in case of maximum discharge if the…
A: Estimate the value of wetted area of a circular section in case of maximum discharge if the radius…
Q: e two center grade lines are to be connected by a 250-meter vertical parabolic curve. Complete…
A: Since we only answer up to 3 sub-parts, we’ll answer the first 3. Please resubmit the question and…
Q: Determine the required size of standard Schedule 40 steel pipe to carry 192 m3 /hr of water with a…
A: Discharge = 192 m3/hr Velocity = 6m/sec Because Q and V are known
Q: Water flows in the symmetrical trapezoidal channel lined with asphalt. S=0.001, n=0.015, determine…
A: The given data is shown below: S=0.001n=0.015
Q: 6. In case of bridge greater than 10.7m in height and which cannot be inspected from beneath due to…
A: Solution : For bridges larger than 10.7m in height for those bridges which cannot be inspected…
Q: (a) What pollutants that can be found in stormwater and what are the sources? (b) Design a circular…
A: Since you have asked multiple questions we will solve first for you, Solution- Stormwater has two…
Q: nat the dam may get washed aw is expected to be only (6 %), wh designed?
A: return period (T) = 30 years time taken for construction = 5 years to find (a) wash away during 5…
Q: A trapezoidal canal with ride aloper 2;1 has bottom a wid th Of tm and carriys aplow of 23 Cu. m/scc…
A: We have relation for critical conditions:Q2g=A3TA=(y×B)+zy2A=(yc×4)+2(yc)2T=B+2zy=4+4ycQ=23m3s-1
Q: Q2) Water is flowing in three side-by-side pipes of diameter (1.8m) each. The Manning's (n) and the…
A:
Q: A trapezoidal channel having side slope (1:1) it is required to discharge 1.478 m3/sec of water per…
A: The given data is shown below: Side slope=1:1Discharge=1.478 m3/sBed slope=1 to 1000C=44C=60
Q: Best section for open channel flow is
A: We know from mannings equation:Q=1nAP23S0.5ASo for given A,n,S Q∝1P23so When perimeter is less…
Q: Draw a well labeled diagram of Bubble centering with a three-screw leveling head.
A: Solution: Well labeled diagram of the centering of bubble with the three screw leveling head.
Q: Is the horizontal surface flow pattern below divergent or convergent? Explain your answer PLAN VIEW…
A: A flow pattern is given and it has been asked to determine type of flow. Please refer step 2 for…
Q: Problem- A sewer of 400 mm dia and slope 1 in 400 running half-full has wwwm flow velocity of 0.82…
A: Given- diameter d=400 mm,slope S1=1 in 400,new slope S2=1 in 100, Velocity V1=0.82 m/s Sewer is…
Q: A channel has to be designed for drainage to carry flow from 200 km. If the flow/km is 0.5 m'/sec/…
A:
Q: In a main water pipe project the staff readings were as below: 0.95 – 2.05 – 1.50- 2.10 - 2.65 -…
A: Determine the grade of each points. BS IS FS Rise Fall HI 0.95 - - - - 403.6 - 2.05 - - 1.1…
Q: Question 5 a) A council garden is to be drained by grassy v-shaped channel with the side slope 1: 4…
A:
Q: H.W1. Find the minimum slope required for 150 mm diameter foul sewer running ½full, to have the…
A:
Q: Relating to interceptor drains for highway and airfield pavements: (a) Outline the traditional…
A: The Comprehensive Annual Financial Report (CAFR) is given below as, A report being prepared and…
Q: H.W/ A longitudinal section survey was conducted for the purpose of implementation of the sewer pipe…
A: Given Longitudinal slope = 0.5% depth = 94.7cm On completing the table given
Q: 1. Calculate the discharge through a 90 mm © sharped edge orifice. Assume Cd = 0.65.
A: Given data- Sharp Edge Orifice- Diameter of orifice (D) = 90 mm =0.090 m Coefficient of discharge…
Q: A trapezoidal canal has one side vertical and the other sloping 1:1. The discharge is known to be 20…
A: Given that, Slope(m)=1:1=1, Mean velocity(V)=1.2 m/s, n=0.015, Discharge (Q)=20 m3/s. The objective…
Q: identify and explain the different types of slope protection
A: Slope Protection Protecting the slopes from the erosion will requires several actions which must be…
Q: a) As an Engineer kindly Design a open channel section , such that the flow at any depth in the…
A: Let us consider a sewer having following properties: d=350 mm=0.35 m V=0.8 m/sec It is required to…
Q: Estimate: 1. The required drop height 2. Spacing of the drops 3. Number of drops required 4. Number…
A:
Q: On a railroad a -0.8% grade meters at 0.4% grade station 2+700 whose elevation of 300 m. The maximum…
A: Length of the curve…
Q: Describe about the Flow nets for representative seepage problems.
A: Flow net is defined as the graphical depiction of the movement of water in the soils. This graph is…
Q: Q1) Water is flowing in three side-by-side pipes of diameter (1.8m) each. The Manning's (n) and the…
A: Given, Pipes of diameter D=1.8 m Manning's (n) =0.017 The bed slope=1:1000 Water depth in each pipe…
Q: O Determine the dimensions of a trapezoidal best section of an open channel whose sides have a slope…
A:
Q: Water is flowing in three side-by-side pipes of diameter (1.8m) each. The Manning's n and the bed…
A:
Step by step
Solved in 2 steps with 1 images
- show fbd & all solutionShow complete solution. 3 dec placesPlease provide the enough information and definition of these construction terms: Civil engineer Clearing and grubbing Client Commercial availability Commercial building Compaction test Concrete cover Concrete curing Concrete Hollow Block (CHB) Confined Space Construction built out Construction estimate Construction firm Construction plan Construction schedule Construction site Contingency plan Contract formation Convenience outlet Conversion Crane Critical path Cross sectional area Cut and fill Daily Activity Report (DAR)
- Develop cost codes for each element of the WBS shown inFigure 7.4. Hint: If you assign the account number 01-00-00 for the overall project, then a good account for the packagingand service area could be 01-01-00, and asphaltpaving could be the account 01-01-02.In contructon xyz , a safety and health committee were developed to satisfy the clients requirement. Project director will be the chairman and this committe will be manged by project manager and advise by the Safety officer. The committe will oversee all construction work aspect which are Mechanical and electrical (M&E), Civil and structural (C&S), Architectural, Infractural works which will be performed by all four site supervisor at site. Illustrate an appropiate organisation structure of safety and health committe for this project.Q3: A company awarded a contract to erect 124 electrical towers the table below shows the sequential operation also the estimated man-hours and optimum number of men/operation the hand over is 6 towers/weeks prepare a line of balance schedule assuming 5 working days/week and 8 hours/day, the minimum buffer time 3 day Activity Man-hour Q(Optimum ofmen/operation Description Excavation 55 64 4. Implementation foundation of reinforced concrete 145 8 Installing the Tower Cable arm fixing Insulator fixing 90 8. 25 Determine the completion date of the project Determine the completion date of the installing Towers Determine the percentage completion of the project when 83% of the electrical tower have been installed. ii- iii-
- Draw simple FBD and submit the solution within 25 minutes, Urgent.Background You are the project manager for a construction project that involves building a new office building. Your team has identified the following tasks that need to be completed, along with their estimated durations: • Clear and grade the site (2 weeks) • Obtain necessary permits (3 weeks) Lay foundation (4 weeks) • Install plumbing and electrical systems (6 weeks) Complete landscaping (2 weeks) • Construct the building shell (10 weeks) • Finish interior (8 weeks) Install exterior finishes (4 weeks) Your Task 1. Using the information above, create a project activities network that illustrates the dependencies and sequence of these tasks. Consider the following questions: o Are the activities in the correct order? o What are the relationships between these activities? 2. Submit your project activities network below. Once you have submitted your response, the next page will be unlocked with a model answer. 3. Review your classmates' responses. Are they the same as yours? Are there…Question 48 schedule is a schedule in which the resources for a project are assigned to activities so the activities can be closely monitored. O resource-loaded O time-loaded A look-ahead O preliminary amazon Bcer F12 Scr Lk Artêtdéf PrtSclimpréc SysRg/Syst. F4 F5 F6 F7 F8 F9 F10 F11 Bre VA
- % consolidation.H.w e Construct the PERT JNet work shown below and determine the expected finish date f Probabilty of finishing the for the data works in 25 months Activity a 6 15 5-10 5-15 1o-20 4 to 15-25 4 7 12 20-45 25-30 4 25-35 30-40 4 35-40 2. 3 4 4 40-50 45-50 50-55 %3BDescribe about the well point assembling.