In a main water pipe project the staff readings were as below: 0.95 – 2.05 – 1.50- 2.10 - 2.65 - 1.35- 2.10- 0.55- 1.40-1.10 If the grade of the last point was (402.5m) and the height of the fill in this point was (1.25m), the slope of the road between points (1 to 3) was (-1.2%),(3 to 6) was (0.0%) and (6 to 8) was (6.7%), calculate the depth of cut and the height of fill in each point and draw the longitudinal section of the ground ,if the distance between each point and another was (20m).
In a main water pipe project the staff readings were as below: 0.95 – 2.05 – 1.50- 2.10 - 2.65 - 1.35- 2.10- 0.55- 1.40-1.10 If the grade of the last point was (402.5m) and the height of the fill in this point was (1.25m), the slope of the road between points (1 to 3) was (-1.2%),(3 to 6) was (0.0%) and (6 to 8) was (6.7%), calculate the depth of cut and the height of fill in each point and draw the longitudinal section of the ground ,if the distance between each point and another was (20m).
Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter14: Highway Surveys And Location
Section: Chapter Questions
Problem 15P
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 3 steps
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning