A plastic injection molding machine operates 320 days a year. It is the bottleneck workstation in a process that produces plastic housed wall clocks. Industrial engineers collected data on the probability of machine breakdowns, the costs of preventive maintenance, and the cost of a breakdown. Number of Molding           Machine Breakdowns per Day 0 1 2 3 4 Probability of a breakdown 0.33 0.28 0.18 0.11 0.10 The cost of preventive maintenance is high due to performing it between 1 and 4 a.m. each day by two machine experts. The preventive maintenance cost is $2,070 per day including replacement parts, cleaning, and software upgrades. The cost of a breakdown of $1,890 is also high because the downstream workstations can only work until all work-in-progress inventory is completed; then the entire process must stop. What are the economics of the situation? Do not round intermediate calculations. Round your answers to the nearest cent. The expected cost of a breakdown per day is $ ___  . The manufacturing firm saves $___   per year by performing preventive maintenance daily on the injection molding machine.

Glencoe Algebra 1, Student Edition, 9780079039897, 0079039898, 2018
18th Edition
ISBN:9780079039897
Author:Carter
Publisher:Carter
Chapter4: Equations Of Linear Functions
Section4.5: Correlation And Causation
Problem 2AGP
icon
Related questions
Question

A plastic injection molding machine operates 320 days a year. It is the bottleneck workstation in a process that produces plastic housed wall clocks. Industrial engineers collected data on the probability of machine breakdowns, the costs of preventive maintenance, and the cost of a breakdown.

Number of Molding          
Machine Breakdowns per Day 0 1 2 3 4
Probability of a breakdown 0.33 0.28 0.18 0.11 0.10

The cost of preventive maintenance is high due to performing it between 1 and 4 a.m. each day by two machine experts. The preventive maintenance cost is $2,070 per day including replacement parts, cleaning, and software upgrades. The cost of a breakdown of $1,890 is also high because the downstream workstations can only work until all work-in-progress inventory is completed; then the entire process must stop. What are the economics of the situation? Do not round intermediate calculations. Round your answers to the nearest cent.

The expected cost of a breakdown per day is $ ___  .

The manufacturing firm saves $___   per year by performing preventive maintenance daily on the injection molding machine. 

Expert Solution
steps

Step by step

Solved in 3 steps with 13 images

Blurred answer
Recommended textbooks for you
Glencoe Algebra 1, Student Edition, 9780079039897…
Glencoe Algebra 1, Student Edition, 9780079039897…
Algebra
ISBN:
9780079039897
Author:
Carter
Publisher:
McGraw Hill