Vehicles arrive at an entrance to a recreational park. There is a single gate (at which all vehicles must stop), where a park attendant distributes a free brochure. The park opens at 08:00 am, at which time vehicles begin to arrive at a rate of 480 veh/hr. after 20 minutes the arrival flow rate declines at 120 veh/hr, and it continues at that level for the remainder of the day. If the time required to distribute the brochure is 15 seconds and assuming D/D/1 queue, a. Determine the maximum length of queue that occurred. b. How long did it take to dissipate the queue? c. What is the average delay per vehicle? Show all necessary solutions and diagram
Vehicles arrive at an entrance to a recreational park. There is a single gate (at which all vehicles must stop), where a park attendant distributes a free brochure. The park opens at 08:00 am, at which time vehicles begin to arrive at a rate of 480 veh/hr. after 20 minutes the arrival flow rate declines at 120 veh/hr, and it continues at that level for the remainder of the day. If the time required to distribute the brochure is 15 seconds and assuming D/D/1 queue, a. Determine the maximum length of queue that occurred. b. How long did it take to dissipate the queue? c. What is the average delay per vehicle? Show all necessary solutions and diagram
Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter12: Forecasting Travel Demand
Section: Chapter Questions
Problem 25P
Related questions
Question
100%
See the answer
Show transcribed image text
Expert Answer
Previous questionNext question
Transcribed Image Textfrom this Question
1.) Vehicles arrive at an entrance to a recreational park. There is a single gate (at which all vehicles must stop), where a park attendant distributes a free brochure. The park opens at 08:00 am, at which time vehicles begin to arrive at a rate of 480 veh/hr. after 20 minutes the arrival flow rate declines at 120 veh/hr, and it continues at that level for the remainder of the day. If the time required to distribute the brochure is 15 seconds and assuming D/D/1 queue, a. Determine the maximum length of queue that occurred. b. How long did it take to dissipate the queue? c. What is the average delay per vehicle? Show all necessary solutions and diagram 2.) Consider the entrance to the recreational park described in the previous question. However, assuming that the average arrival rate is 180 veh/hr and Poisson-distributed (negative exponential times between arrivals) over the entire period from park opening time, 08:00 am until
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 1 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Residential Construction Academy: House Wiring (M…
Civil Engineering
ISBN:
9781285852225
Author:
Gregory W Fletcher
Publisher:
Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Residential Construction Academy: House Wiring (M…
Civil Engineering
ISBN:
9781285852225
Author:
Gregory W Fletcher
Publisher:
Cengage Learning