Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe, which sells for $210, contains both gas- and liquid-filled compartments to provide more stability and better protection against knee, foot, and back injuries. Manufacturing the shoes requires 10 separate tasks. There are 400 minutes available for manufacturing the shoes in the plant each day. Daily demand is 62. The information for the tasks is as follows: Fig. 1 Performance Time (mins) Task Predecessors A A B Fig. 2 D C, D F A 2 F H Е, Н a-b) The correct precedence relationship with one of the possible assignments of tasks using the "ranked positioned weight" to workstations is shown in Fig. 3 c) The efficiency of the assembly line with 5 workstations shown in the figure chosen above=% (enter your response as a percentage rounded to one decimal place). d) The idle time for the assembly line per cycle = minute(s) (enter your response as a whole number).
Q: a) The cycle time for the production of a PDA = enter your response here
A: Project schedule helps in calculating different values all related to the production cycle like the…
Q: Mach 10 is a one-person sailboat designed to be used in the ocean. Manufactured by Creative Leisure,…
A: FIGURE 3 is the correct answer
Q: The Action Toy Company has decided to manufacture a new train set, the production of which is broken…
A:
Q: Shown below are the tasks, times, and precedence requirements for the work required to assemble a…
A: The production line is the set of machines in a systematic manner for assembling of product in an…
Q: 1. Crispy chips company operates in two shifts every day. Each shift is for a duration of 8 hours.…
A: Answer: The total time taken in the process of manufacturing = set up time + Run time…
Q: The following table details the tasks required for Indiana-based Frank Pianki Industries to…
A:
Q: The Action Toy Company has decided to manufacture a new train set, the production of which is broken…
A: Given- Available time over 40 hours work week = 40 hours×3600 seconds per hour…
Q: The following is a list of activities that must be completed in order to assemble a car. Draw the…
A: Note: - Since we can answer only up to 3 subparts we will answer subparts 1, 2, and 3 for your…
Q: XYZ makes two'types of products using 4 machines for 8 hours 'each day. Product A visits machines 1,…
A: Given: There are two products and using 4 machines Available time =8 hours =8*60=480 minutes
Q: Given the following task, times, and sequence, develop a balanced line capable of operating with a I…
A: A project network diagram is a sequence in which a project's activities are carried out. The…
Q: (a) T. Smunt Manufacturing Corp. has the process displayed below. The drilling operation occurs…
A: Since we only answer up to 3 sub-parts, we’ll answer the first 3. Please resubmit the question…
Q: a) Which server is the bottleneck of the process ? b) What is the…
A: Note: As per the guidlnies of Bartleby, only three parts have been answered, for getting answers for…
Q: A company is designing an assembly line for a new line of lamps. 6. It has identified 9 tasks and…
A: Note: - Since we can answer only up to three subparts, we will answer the first three subparts…
Q: All Smiles Dental Clinic would like to develop a hygienist master schedule for the treatment of…
A: MPS involves the schedules of production wherein the employees have to process orders as per the…
Q: A quoting department for a custom publishing house can complete 4 quotes per day, and there are 20…
A:
Q: XYZ Company is a multinational company which exports ladies dresses to European countries. For the…
A: 1. The total number of quantity, q = 14000 pieces. Time taken per piece,t = 5 minutes. Thus,…
Q: XYZ is famous for homemade pizzas which are crisp with thin crust and varied toppings giving the…
A: Since you have posted a question with multiple sub-parts, we will solve the first three subparts for…
Q: A work cell is scheduled to build 120 digital light processor (DLP) assemblies each week. These…
A: Demand= 120 dlp Work time (cell)= 6.5 hours×5= 32.5 hours= 1950 minutes Takt time= Work time of…
Q: 1. A work system has five stations that have process times of 5, 12, 4, 9, and 8. What is the…
A: Throughput time is also called cycle time. The total amount of time it necessitates for a company…
Q: he Action Toy Company has decided to manufacture a new train set, the production of which is broken…
A: Note, Since you have posted multiple parts of the question in the same questions, we will be…
Q: Given the following line balance data in the table below. For eight hours of operating time per day…
A: Line balancing is a creation system that includes balancing administrator and machine time to…
Q: Draw a precedence diagram. Compute for the cycle time, theoretical minimum, idle time, efficiency,…
A: AS PER GUIDELINES, WE ARE ALLOWED TO DO THE FIRST THREE SUB-PARTS AT A TIME. PLEASE POST THE REST…
Q: is goal is to produce 1,000 bicycles per standard 40-hour workweek, Time Task Precedence Tasks (sec)…
A: Given: His goal is to produce 1000bicycles in 40hours workweek First we have to calculate the cycle…
Q: An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the totaltime…
A: Minimum cycle time = length of the longest task Therefore, the minimum cycle time = 2.4 minutes
Q: A small formwork subcontractor is awarded to erect formwork. It has been estimated 75labor-days. The…
A: Production is the process of converting inputs into finished products and services for the…
Q: Suppose the times for the individual operations for the in-line skate assembly are as follows: Task…
A: Given- Desired output is 100 units per hour.We know that- 1 hour = 60 min × 60 sec = 3600…
Q: DreamInflate is a balloon manufacturing company. Balloon manufacturing consists of seven work…
A: As per your request, I have solved the last question from the given set of questions. Kindly find…
Q: An assembly line is to be designed to operate 7.5 hours per day and supply a steady demand of 300…
A: Given that - Demand = 300 units Operating time = 7.5 hours per day
Q: Illinois Furniture, Inc., produces all types of office furniture. The "Executive Secretary" is a…
A: Given that: Production time = 480mins Production unit =52
Q: The Action Toy Company has decided to manufacture a new train set, the production of which is broken…
A: Cycle time is the proportion between Total available production time and total required demand. it…
Q: b) Given the demand, the cycle time for the production of the new train set =
A: Formula for cycle time : Cycle time = (Total time for work)/(Demand) Given, Demand = 4600 units…
Q: The Action Toy Company has decided to manufacture a new train set, the production of which is broken…
A: Given data: Demand = 4600 units workweek = 40 hours As per the information Precedence diagram is:
Q: b)(i) If there are only three resource skills available ource load chart based on the resource…
A: A small introduction about Resource Constraint: The term "resource constraint" refers to the…
Q: Calculate the efficiency of the newly design process.
A: A line balancing efficiency indicates the proportion between total task time and total workstation…
Q: The ABC Company is planning a new product line and a new plant to produce the parts for the line.…
A: The total number of components equation is; npf = PQnp Here, P is the number of different models, Q…
Q: For manufacturing electric bus Total labor hours, estimation process, and summary results
A: The total labor hours to manufacture electric buses and their batteries can include 6 to 5 hours,…
Q: #2.1] The setup from quiz 1 questions 4 & 5 is repeated below: "Consider software projects flowing…
A: The bottleneck process refers to the chain of project management, which reduces the capacity of the…
Q: Create a simple but realistic S-curve showing the budget and time allotment for renovating a room,…
A: To renovate the room, first, I would identify the tasks, for each task, I would allocate a time data…
Q: Compute the cycle time for Sunburn Pharmaceuticals given the following data: set-up time, 2 hours;…
A: Given, Set up time= 2 hours Process time= 10 hours Move time = 80 minutes=1.3 hours Wait time =20…
Q: A) Which step in this process is the bottleneck? =30 min for tan leather B) How many briefcases are…
A: Annual capacity= 8*250*2 =4000 briefcases
Q: Smart Kids Wonderland has decided to manufacture a new train toy set. The production process consist…
A: Given information, Task Time Predecessors A 16 B 17 A C 10 A D 12 B E 8 C F 15…
Q: Explain why doubling the capacity of a bottleneck may not double the system capacity? Use a…
A: Answer: The limiting factor or a constraint is considered to be a 'Bottleneck' in a workstation…
Q: Karina Nieto works for New Products Inc., and one of hermany tasks is assigning new workers to…
A:
Q: 1- Describe the three main measures used in the theory of constraints 2- What are the steps…
A: The Theory of Constraints is an management approach that thinks about that at some random time, an…
Q: Bill’s Barbershop has two barbers available to cut customers’hair. Both barbers provide roughly the…
A: Answer: We can see from the figure, shown in the question that every customer has first go through…
Q: a. Construct a precedence diagram and compute the lead time for the process. b. If the demand for…
A:
Q: Rock View Restaurant is a new fast food restaurant chain. The Operations Manager has divided its…
A: A line balancing heuristic will helps to identify the allocation of activities to workstations based…
Q: A production process consists of a three-step operation. The scrap rate is 10 percent for the…
A: A three-step process Scrap rate at step-1 = 10% = 0.10 Scrap rate at step-2 = 6% = 0.06 Scrap rate…
Can you assit me with this problem 9 by showing me the process step by step. Thank you kindly
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwindshoe, which sells for $210, contains both gas- and liquid-filled compartments to provide morestability and better protection against knee, foot, and back injuries. Manufacturing the shoesrequires 10 separate tasks. There are 400 minutes available for manufacturing the shoes inthe plant each day. Daily demand is 60. The information for the tasks is as follows: Task Performance Time (In minutes) Task Must Follow This task A 1 ___ B 3 A C 2 B D 4 B E 1 C.D F 3 A G 2 F H 5 G I 1 E,H J 3/25 I 1. What is the theoretical minimum number of work stations required to satisfy this output rate? 2. Allocate the tasks to work stations taking into consideration the precedence requirements and usingthe LOT rule to break ties between feasible tasks.Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe, which sells for $210, contains both gas- and liquid-filled compartments to provide more stability and better protection against knee, foot, and back injuries. Manufacturing the shoes requires 10 separate tasks. There are 400 minutes available for manufacturing the shoes in the plant each day. Daily demand is 64. The information for the tasks is as follows: Task Performance Time (mins) Predecessors A 1 − B 3 A C 1 B D 4 B E 1 C, D F 3 A G 2 F H 5 G I 1 E, H J 3 I a) The efficiency of the assembly line with 5 workstations shown in the figure chosen above=(enter your response as a percentage rounded to one decimal place). b) The idle time for the assembly line per cycle =minute(s) (enter your…Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe, which sells for $210, contains both gas- and liquid-filled compartments to provide more stability and better protection against knee, foot, and back injuries. Manufacturing the shoes requires 10 separate tasks. There are 400 minutes available for manufacturing the shoes in the plant each day. Daily demand is 60. The information for the tasks is as follows: Performance Time Task (in minutes) 1 Н ABCDEFGH Task Must Follow This Task C, D ABB GAFG 324-325- E, H 25 312 | Required: a. Draw the precedence diagram showing the task precedence and their times b. Determine the cycle time associated with the rate of output required. c. What is the theoretical minimum number of work stations required to satisfy this output rate? d. Allocate the tasks to work stations taking into consideration the precedence requirements and using the LOT rule to break ties between feasible tasks. e. What is the…
- Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe, which sells for $210, contains both gas- and liquid-filled compartments to provide more stability and better protection against knee, foot, and back injuries. Manufacturing the shoes requires 10 separate tasks. There are 400minutes available for manufacturing the shoes in the plant each day. Daily demand is 62.The information for the tasks is as follows: Task Performance Time (mins) Predecessors A 1 − B 3 A C 1 B D 4 B E 1 C, D F 3 A G 2 F H 5 G I 3 E, H J 2 I a-b) The correct precedence relationship with one of the possible assignments of tasks using the "ranked positionedweight" to workstations is shown in Fig 1, 2 or 3 c) The efficiency of the assembly line with 5 workstations shown in the figure…Manufacturing Company uses FIFO method of accumulating costs in a two-department process. Materials are introduced at the inception of the process except for a special material which is added in department 2 at 60% completion as to overhead. Inspection is done at the end of the process in both departments. Production data for Department 2 are given below: In process, beginning, (80% labor, 70% overhead)2,000 Transferred in 14,900 In process, ending (40% labor, 20% overhead) 3,000 Normal spoilage 200 Abnormal spoilage (found at 30% completion as to laborand 15% as to overhead due to internal failure) 400 Cost data for the month:In process beginning:Transferred in 15,020 Special materials 1,900 Direct labor 4,388 Overhead 11,044 Current costs:Transferred in 137,080 Special materials 14,030 Direct labor 46,000 Overhead 113,564 The cost of units transferred to finished goods is?The cost of spoilage charged to revenue is?The Action Toy Company has decided to manufacture a new train set, the production of which is broken into six steps. The demand for the train is 4,600 units per 40-hour workweek: Performance Time Task (seconds) Predecessors A 20 B 28 15 15 10 B, C D, E 30 This exercise only contains parts b, c, d, e, and f. b) Given the demand, the cycle time for the production of the new train set = seconds (round your response to one decimal place). n 12e
- Vikiki Furniture, Inc. produces all types of office furniture. The "Executive Secretary" is a sofa-bed that has been designed using ergonomics to provide comfort during long work hours. The sofa-bed sells for $138. There are 580 minutes available during the day, and the average daily demand has been 65 items. There are eight tasks: Task performance time (min) task must follow task listed A 4 -- B 7 -- C 6 A, B D 5 C E 6 D F 7 E G 8 E H 6 F, G Total 49 min What is the Cycle time for this operation?Dave Grubbs of Grubbs Auto Body has five cars waiting for Economy Detailing. An Economy Detailing consists of a wash and then a hand wax. Cars cannot be waxed until they are washed. ROUND UP (39/5) & (39/10). Wash (hours) Wax (hours) (J)aguar 39/5 5 (C)adillac 5 3 (F)ord 1 39/10 (H)onda 2 1 (L)exus 4 4 What schedule produces the shortest time span in which these orders can be completed? Sequence: ____ , _____ , _____ , ______ , ______ Create a Gantt chart for the optimal sequence (shortest time span). How many hours does it take to complete the five orders? For the schedule in question “a”, how many hours is the waxing task idle? When will Dave finish the Cadillac? What is the average order completion time?Task: Draw a BPMN diagram for the financial workflow business process illustrated on pages 133-134 in Chapter 5 (pictures uploaded).
- DEFINE CONWIP (CONstant Work-In-Process)Theories and concepts: Cause of the difficulties In this section, I will explain the causes of the difficulties which I have explained above. The reason for the missing cages uses to be that the cage is still being picked or not and if the picker is still using the cage to pick the items then request the picker to drop the cage off to the packing department so that the items can be packed and sent out the shipping department for the delivery. Also, if the cage is not in the picking department buffer or pack buffer and is not being picked then as a process guide it was my duty to search for the cage at the packing stations first, and if not found then to escalate to the management so that relevant department can be contacted for the action. During the critical pool time, there were a few shipments IDs use to get sent down from the picking department which they couldn’t send into the picker’s scanners as either the batch assigned for the item by the stowing department would be wrong or…Alocal toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performed. The daily demand is 100 toys. Times of the tasks are 2.73, 2.01 201 2.13, 2.0, 2.61, 2.71 , and 2.95 minutes for A,B,C,D,E,F, and respectively. However, due to the nature of the product there are precedence rules that must be observed. Such that Task Adoes not need any predecessorsB requires task A to completed. To start task C and task Deach require task B to be completed. Task C must be completed prior to stating task E. Task F needs both task D and task Eto be completed. Finally, task G can start only once task Fis completed.Given we apply the most remaining tasks rule for balancing the assembly line with ties broken according to longest task time firstthe tasks that will be assigned to the SECOND workstation are