Q5: A 50m *30m site has 1 m thick layer of organic soil, to be replaced with granular fill (G=2.6) with 21% fines and 31% oversized particles (Gos= 2.60 and wsSD = 1.9%). The site is prepared for 10-story building with a parking lot. Standard Proctor tests are performed on the fill material without oversized particles, and the test results are shown below. Yd. za Compaction test

Principles of Geotechnical Engineering (MindTap Course List)
9th Edition
ISBN:9781305970939
Author:Braja M. Das, Khaled Sobhan
Publisher:Braja M. Das, Khaled Sobhan
Chapter4: Plasticity And Structure Of Soil
Section: Chapter Questions
Problem 4.9P
icon
Related questions
Question
Q5: A 50m *30m site has 1 m thick layer of organic soil, to be replaced with granular fill (Gs=2.6) with 21%
fines and 31% oversized particles (Gos= 2.60 and wsSD = 1.9%). The site is prepared for 10-story building
with a parking lot. Standard Proctor tests are performed on the fill material without oversized particles,
and the test results are shown below.
Yd.
Compaction test
Moisture content (%)
Wet unit weight (kN/m³)
8.8
16
10.6
18.1
12.7
19.4
14.7
18.7
16.6
16.9
1) What are the key performance parameters?
2) Determine the parameters needed for field compaction.
3) If the average productivity of a single compactor is 30 m³/hr, how many days are need to finish the
compaction work, assuming 8 working hours per day?
Transcribed Image Text:Q5: A 50m *30m site has 1 m thick layer of organic soil, to be replaced with granular fill (Gs=2.6) with 21% fines and 31% oversized particles (Gos= 2.60 and wsSD = 1.9%). The site is prepared for 10-story building with a parking lot. Standard Proctor tests are performed on the fill material without oversized particles, and the test results are shown below. Yd. Compaction test Moisture content (%) Wet unit weight (kN/m³) 8.8 16 10.6 18.1 12.7 19.4 14.7 18.7 16.6 16.9 1) What are the key performance parameters? 2) Determine the parameters needed for field compaction. 3) If the average productivity of a single compactor is 30 m³/hr, how many days are need to finish the compaction work, assuming 8 working hours per day?
Expert Solution
steps

Step by step

Solved in 4 steps with 1 images

Blurred answer
Knowledge Booster
Highway drainage
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Geotechnical Engineering (MindTap C…
Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning