Given the following table, what is the minimum profit and overhead for this project? Description Grading and Excavation Sanitary Sewer Water Line Storm Drain Site Concrete - Labor Site Concrete - Concrete Outside Lighting $31.485 O $25,945 O $33,515 $29,835 Contract Billed to Date Actual Costs Amount $234,699 $234,699 $57,800 $27,365 $31,750 $16,850 $19,200 $21,265 $23,600 $197,830 Budgeted Costs $59,000 $28,200 $31,000 $17,000 $19,200 $20,900 $23,600 $198.900 Overrun -1,200 -835 750 -150 0 365 0 -1,070
Q: For the cable structure below, calculate the tensile force in each cable segment. Ensure to…
A:
Q: A vessel of constant rectangular cross-section is 60 m long, 10 m beam and 7 m in depth. The vessel…
A: Answer Length L = 60 m Width B = 10 m Depth = 7 m Draught = 3 m Water density ρw = 1.025 t/m3…
Q: Calculate coefficient of permeability in m/sec, if the coefficient of consolidation and volume…
A: Given- Coefficient of consolidation Cv=4.8 mm2/min, Coefficient of volume compressibility-…
Q: In a thin cylindrical shell, the ratio of longitudinal stress to hoop stress is (a) 0.5 (c) 1.5 (b)…
A: Introduction : The given question is related with solid mechanics . The stress acting along…
Q: 6. The vertical post is secured by three cables. The cables are pre-tensioned so that the resultant…
A: Given: Force in cable AD = 180 lbs Resultant force direction = along z-axis. To find : values of…
Q: A liquid which is compressed in a cylinder has a volume of 1 liter at 2Mpa, and a volume of 990…
A: Given data : V1 = 1000 cu.cm , V2 = 990 cu.cm , P1 = 2 Mpa , P2 = 2.5 Mpa Find : Coefficient of…
Q: A 3500 lb vehicle is being designed with a drag coefficient of 0.4 and a frontal area of 50 ft2. If…
A: Given Data : ρ=0.002378 slugs/ft2 C∘=0.4 G=3500 lb…
Q: Determine the vertical displacement at A for the structure below by using virtual work and FMoA.…
A: Given: E,I=Constants A=∞ To find: Vertical Displacement
Q: Question 2 Given the following spot speeds: 16, 17, 18, 19 and 20, solve for the space mean speed.
A: Given data in question Spot speeds 1) 16,17,18,19 and 20 2) 10,20,35,50 and 60 To find out Time…
Q: A vertical wall is of 8 m in height. A jet of water is coming out from a nozzle with a velocity of…
A: Given Data- height of wall y=8 m, Velocity of jet U=20 m/s, Distance of jet from wall x=20 m, To…
Q: Is frame is statically determinant
A: Given data : The number of member in framed structure m=3 The number of joint in frame J=4 The…
Q: Solution must be accompanied by free body diagram 3. Resolve the forces into X and Y components.…
A: To find x and y components of force
Q: a vehicle purchased for 43,000 at a constant rate of 25% how many years it takes for the vehicle…
A: Given, Original value of vehicle =43,000 Constant rate depreciation = 25% Value after some years =…
Q: A downward grade of - 5.6% and another upward grade of +3.8% were connected with a vertical curve of…
A: Answer We are given G1 = -5.6% G2 = 3.8% Length of verticle curve L = 300 m RL of EVC = 92.500 MSL…
Q: Calculate the forces in all members of the truss shown using method of joints...
A: Given : Introduction : Method of joints ? It is a method by which we can determine the unknown…
Q: The coefficients of friction between the load and the flat-bed trailer shown are us = 0.30 and uk =…
A:
Q: Solve for the reactions at the supports of the structures loaded as shown then draw the shear and…
A: Degree of static indeterminacy, Ds Ds = number of unknown support reaction - known support reaction…
Q: 14" 10' 2" 2" 14" (3) Sx = ? (4) Zx = ?
A:
Q: The value of the parallel component P to the incline is 400 lbs. Compute the value of the…
A: Given Data Parallel component = 400 lbs To find Perpendicular Component of P And to find P
Q: Water flows through the Venturi meter as shown in the figure below. The specific gravity of the…
A: Given Data : Specific gravity of the manometer fluid = 1.52 Determine the flow rate in feet cubed…
Q: 5.48 Water is sprayed radially outward over 180° as indicated in Fig. P5.48. The jet sheet is in the…
A: Given data:- Water is sprayed radially outward 180° The given jet velocity at the nozzle exit is, 30…
Q: 2. A two-dimensional square channel redirects a water flow from horizontal uniform to vertical…
A:
Q: A moist soil has a volume of 0.0081 m³ and weighs 151.2 N. The oven dry weight of soil is 138.6 N.…
A: Given: Volume of moist soilV=0.0081 m3 Weight of moist soilW=151.2 N Dry weight of soilWs=138.6 N…
Q: 9-7. Determine the stress components acting on the inclined plane AB. Solve the problem using the…
A:
Q: A frame structure experiences a uniformly distributed load as shown in the figure. The structure has…
A:
Q: 4/ By using the working stress design method, find the maximum flexural moment can be carried by the…
A: Given-The Cross sectional area of two reinforced concrete beams having fs=165MPa and fc=12.5MPa…
Q: A layer of sand extends from ground level to a depth of 9 m and overlies a layer of clay, of very…
A: Given : Water table is 6 m below Ground level Saturated unit weight of sand = 19 kN/m3 Saturated…
Q: 5. The two forces shown act on the structural member AB. Determine the magnitude of P such that the…
A:
Q: 6 12 16 23 0 95 140 150 173 ke a scatter diagram of the data.
A: Given: Take x be the age of pony whereas y be the average weight.
Q: 7. Find the reactions at the supports and the deflection at point C from the restrained beam shown.…
A: Given: A fixed beam of 8.5 m with a concentrated load of 52 KN at 5 m from left end. Required:…
Q: Consolidadadaicla For a particular loading Condition unsaturated clay layer undergoes 30%…
A: Given- 30% consolidation in 180 days, U1=30% & t1=180 days, Further 20% consolidation, so,…
Q: of 100 mgd is to be obtained from a reservoir that is charged by runoff from a 190 mi² watershed.…
A: According to given data A flow of 100 mgd is to be obtained from a reservoir that is charged by…
Q: 5.1 At a borrow site, sandy soil was excavated. The soil had y = 19.3 kN/m³, 12.3%, and G, = 2.66.…
A: Given : Unit weight of soil = 19.3 kN/m3 W = 12.3 % GS = 2.66 emax = 0.564 and emin = 0.497 To…
Q: A cylindrical soil sample, 7.3 cm in diameter and 16.8 cm in height, is tested in a constant-head…
A: According to given data A cylindrical soil sample, 7.3 cm in diameter and 16.8 cm in height, is…
Q: using principles of virtual work determine support reactions L12 B + L12 2W с
A: Figure is as shown
Q: liquid which is compressed in a cylinder has a volume of 1 liter at 2Mpa, and a volume of 990 cu.cm…
A: It is defined as the ratio of pressure applied to the corresponfing volume percentage change of the…
Q: A fully submerged infinite sandy slope has an inclination of 30° with the horizontal. The saturated…
A:
Q: For the below wooden beam, under the given loading and dimensions: 50 KN w = 10 kN/m müm с 4m…
A: Given: Ewood=12 GPa To find: Maximal normal stress
Q: Given the three-wire leveling note below, find the elevation of BM2 and perform the customary…
A: Given: The data for the three-wire levelling is given as: To Determine: The elevation of BM2 and…
Q: Under what circumstances would you consider using LiDAR instead of more traditional ground surveying…
A: LiDAR - Light detection and ranging or laser imaging, detection, and ranging is a method for…
Q: Draw the Axial Force Diagram (NFD), Shear Force Diagram (SFD) and Bending Moment Diagram (BMD) for…
A:
Q: Can you explain the equation of momentum on why you decied to use the pressure and area
A: Given, V1 = 25 ft/s V2 = 100 ft/s
Q: Determine (a) the distance a for which the maximum absolute value of the bending moment in the beam…
A: Given : To Find : A) distance a for which max absolute value of bending moment will be as small as…
Q: Q/What are the methods of plumbing with a mention of the reasons for each of these methods?
A:
Q: did you get those Vout and Vin from? why did you decied to use them
A: This question is related to the Fluid Mechanics from Civil Engineering.
Q: A motorized wheel is spinning with a rotational velocity of wo = 1.81 rad/s. At t = 0s, the operator…
A: Given c= 1.5574 , b= 6.09 s-2
Q: A tube well of 30 cm dia. is installed in a confined aquifer having 20 m thickness by WASA in the…
A: Given; Diameter of tube well = 30cm = 0.3m Thickness of confined aquifer = 20m Distance of two…
Q: 5.50 A variable mesh screen produces a linear and axisymmet- ric velocity profile as indicated in…
A: A variable mesh screen produces a linear and axisymmetric velocity profile for the air flow…
Q: c. a plant with extensive history GODINIS of the mix design if d. a plant with extensive history of…
A:
Q: 140 150 181 ter diagram of the data. Then visual. lator to verify that Ex= 59, Ex² = 94
A: Given: Take x as the age of pony whereas y be the average weight
Kk.4.
Step by step
Solved in 3 steps with 1 images
- The following table represents the activities of a small construction pro- ject that is required as follows Act. Dur. Dep. on A 5 B 12 C 7 A 10 E 7 2 D,E 12 D,E G 10 F 4 D,B H,G,F H,G,F M 2 K N M,L 1) Find the critical path and project implementation period. 2) The contractor stipulates a delay fine of one million dinars for each day of delay, the amount of the delay fines that the contractor will pay if the event is delayed (J) (6 weeks), knowing that a week is equal to (6 days). 3) The contractor applied the incentive system for workers within the activities G, D, so that the productivity of that group increased by 50%, what is the time period in which the project duration decreased. 4) The delay of the contractor in the implementation of the event (L) so that the total project period was delayed (3 weeks). VWhat is the period during which the event was delayed (L)? 5) Activity D.E is carried out using a specific machine. Will the contractor pay a late fine if only one machine is…conomy-lec5 MARR Annual Worth Example: Aproject requires an initial investment of $45,000, has a salvage value of $12,000 after six years, incurs annual expenses of S6,000, and provides an annual revenue of $18,000. Using a MARR of 10%, determine the AW of this project. $12,000 $18,000 $6,000 $45,000 D 17:45 / 23:42 CCH.w e Construct the PERT JNet work shown below and determine the expected finish date f Probabilty of finishing the for the data works in 25 months Activity a 6 15 5-10 5-15 1o-20 4 to 15-25 4 7 12 20-45 25-30 4 25-35 30-40 4 35-40 2. 3 4 4 40-50 45-50 50-55 %3B
- 7. A contractor agreed that. If his job was not done by a certain date, he would pay $100 forthe 1st day of delay and for each succeeding day $ 5 more than the preceding day, How manydays after the stipulated date did he use if his penalty is $1080.A project consist of seven activities as shown in the table Draw the network diagram calculate the fst LST EFT LFT and Floats mark the entical path 4 find out the Project duration A B Activity Duration Days 8 10 Post Activity BIC D CD E F G 12 6 4 32 € F G G-A Moving to another question will save this respo The first cost of an electric rebar bender is P300,000 and a salvage value of P44,000 at the end of its life for 7 years. Money is worth 4.9% annually If there is no salvage value and the annual maintenance cost is P17,000, find the annual cost of perpetual service. Question 6 Express your answer in whole number. « < Question 6 of 50 A Moving to another question will save this response. acer Home Pa Uc PrtSc Pause Del F10 F11 F12 F8 F9 SysRq Ins F5 F6 F7 Scr Lk Break F2 F3 F4 Coca') & Backspace %23 7 8 9. 4 5 € Y
- Dear eng Pls ans quickly ThanksShow solutions pls. ThanksQUESTION 1 Once the contractor has received the notice to proceed, he mustdo the following: OA Move the equipment OB. Move the showers OC. No answers are validi OD Move materials and people OE Move the equipment, materials, and people QUESTION 2 During construction, one way to identify how long each acitvity will take is OA After award, but before owner signs the Agreement OB Interview other contractors who have done similar work OC Create a schedule OD. No answers are valid OE In the pre-construction phase OF Ask the owner how long they want the activity to last QUESTION 3 One way a project schedule is used is to evaluate impact of changes in the work. O True False QUESTION 4 A list of proposed subcontractor activities should be prepared during the following: 0 A. Budget preparation OB Pre-construction phase OC. Negotiation of contract OD. Bid of the project OE. No answers are validi
- Q1/ Answer by true or false (Tor F) of TEN of the following; It is better not to use traditional approach when client wishes to appoint designers separately. 1- 2- 3- 4- 5- 6- 7- 8- 9- Due to the high risk in turn-key approach that only contractor bears, thus the contract in such approach may require higher cost. The cost of depreciation does not depend on the maintenance cost. When the no. of hours for changing oil increases, then the oil consumption will increase too. The equipment can be considered standard if it is familiar and can be used in several projects. For economic purposes, one should always make a trade-off and comparisons among different types of equipment. In general, soil stabilization methods try to reduce porosity, increase density and capacity. The salvage value of standard equipment is always higher than for special ones. The horsepower of the engines is inversely proportional to the height at which it is operated.Which of the following is not a phase of construction project? Select one: a. Tendering b. Estimation c. Briefing d. Commissioning Question 29 Not yet answered Marked out of 1.00 P Flag question What would be the payback period of excavator generating annual return of $70000 and initial cost $350000 and service life 7 years? Select one: a. 2 YEARS b. 3 YEARS c. 4 YEARSPls answer with complete solution. I need it ASAP. Thank you!