A warehouse manager at Mary Beth Marrs Corp. needs to simulate the demand placed on a product that does not fit standard models. The concept being measured is "demand during lead time," where both lead time and daily demand are variable. The historical record for this product, along with the cumulative distribution, appear in the table. Demand During Lead Time Cumulaive Probability Probability 120 0.01 0.01 140 0.12 0.13 160 0.35 0.48 180 0.20 0.68 200 0.04 0.72 220 0.08 0.80 240 0.20 1.00 The following random numbers have been generated: 9, 78, 40, 41, and 99. (Note: Assume the random number interval begins at 01 and ends at 00.) Based on the given probabilty distribution, for the given random number the demand during the lead time is: Random Number 9 78 40 41 99 Demand The average demand during the lead time is (enter your response as an integer). The total demand during the lead time based on the five simulations is (enter your response as an integer).
A warehouse manager at Mary Beth Marrs Corp. needs to simulate the demand placed on a product that does not fit standard models. The concept being measured is "demand during lead time," where both lead time and daily demand are variable. The historical record for this product, along with the cumulative distribution, appear in the table. Demand During Lead Time Cumulaive Probability Probability 120 0.01 0.01 140 0.12 0.13 160 0.35 0.48 180 0.20 0.68 200 0.04 0.72 220 0.08 0.80 240 0.20 1.00 The following random numbers have been generated: 9, 78, 40, 41, and 99. (Note: Assume the random number interval begins at 01 and ends at 00.) Based on the given probabilty distribution, for the given random number the demand during the lead time is: Random Number 9 78 40 41 99 Demand The average demand during the lead time is (enter your response as an integer). The total demand during the lead time based on the five simulations is (enter your response as an integer).
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 40P
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step 1: Define Simulation
VIEWStep 2: Extract the given information
VIEWStep 3: Construct the Interval for the Cumulative Probabilities
VIEWStep 4: Determine the Interval for the Random numbers
VIEWStep 5: Calculate the Average Demand during Lead time
VIEWStep 6: Calculate the Total demand during lead time
VIEWSolution
VIEWStep by step
Solved in 7 steps with 2 images
Recommended textbooks for you
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,