5. A farmer wants to hire workers to pick 1600 bags of beans. Each worker can pick 10 bags per hour and is paid $1.00 per bag. The farmer must also pay a supervisor $20 per hour while the picking is in progress. She has additional miscellaneous expenses of $8 per worker (but not for the supersivor). How many workers should she hire to minimize the total cost? What will the cost per bag picked be?
Q: A small electronic company assembles power supplies for use in bread maker, cake mixer and food…
A: a) Cycle time = Time take /Demand Cycle time = 52 min per hr / 200 per hr = 0.26 minutes / unit b)…
Q: Mop and Broom Manufacturing is evaluating whetherto produce a new type of mop. Th e company is…
A:
Q: C be used for the sct of tools on a lathe The tools must be sharpened periodically. Data for each…
A: Below is the solution:-
Q: Which of the following are components of the compensation package for members of camera/drone PATS?…
A: Compensation package refers to the process combine the employee salary and fringe benefits by the…
Q: A small consulting firm has an overhead rate of 200% of direct labor charged to each job. The…
A: Total Job Cost = Material Cost + Labor Cost + Overhead Cost
Q: A manager must decide how many machines of a certain type to purchase. Each machine can process 100…
A: Let the break-even point for one machine be x,
Q: This year, Benson, Inc., will produce 57,600 hot water heaters at its plant in Yuiee, Florida, in…
A:
Q: 4. Assume that a business firm finds that its profit is greatest when it produces $40 worth of…
A: Resource Units Required Resource Price per Unit of Resource Technique 1 Technique 2…
Q: Yost-Perry Industries (YPI) manufactures a mix of affordable guitars (A, B, C) that are fabricated…
A: Given Product A demand is 60 units per week Product B demand is 80 units per week Product C demand…
Q: This year, Druehl, Inc., will produce 57,600hot water heaters at its plant in Delaware, in order to…
A: Given data: Output = 57600 units per year Labor time t = 160 hours per month = 160 × 12 = 1920 hours…
Q: What is the amount of increase in profit for each Machine Hour added and what is the maximum number…
A:
Q: Tribal Systems, Inc., is opening a new plant and has yet todecide on the type of process to employ.…
A: We know that Total cost = Fixed cost + (Variable cost * no of units produced) We can compare the…
Q: Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe,…
A: Given - Daily demand = 62 Time available for manufacturing the shoes = 400 min/day
Q: Consider an outpatient surgery center that is located in a rectangular building that is 90 feet by…
A: Facility layout is the systematic organization of various production components for achieving…
Q: The shift time is 10 hours and the allowed factor is 16%. Given that the normal time for a task is…
A: The worker completes the task in 1.15 minute and the normal time taken to complete the tasks is 1.5…
Q: A processor makes two components, A and B, which are then packaged together as thei nal product…
A: Operation management in an organization aims at providing the highest efficiency possible. It…
Q: A coffee shop takes two steps to make a cup of coffee. Step 1 takes 30 seconds. Step 2 takes 20…
A: Given- Step 1 takes = 30 secondsStep 2 takes = 20 secondsLabor cost= $20 per hourNo. of labors = 2…
Q: Petroleum be produced from crude oil is considered a system Select one: O a. Continuous O b.…
A: Petroleum produced from crude oil would be a job shop system.
Q: A small electronic company assembles power supplies for use in bread maker, cake mixer and food…
A: Since we only answer up to 3 sub-parts, we’ll answer the first 3. Please resubmit the question and…
Q: What do you think should be the procedure of the extension worker in solvingt theproblems? What are…
A: Extension worker is the experienced worker who has been using the traditional methodology and is…
Q: What is the takt time when the demand is 250 units, the total available time is 480 mins, the…
A: Takt Time= Available Minutes for ProductionRequired Units of Production
Q: 1) An operator is used for loading and unloading of parts to automated machines. Loading time is 1…
A: We know the activities needed and the time required to complete each activity, we could determine…
Q: Susan Williams runs a small Flagstaff job shopwhere garments are made. The job shop employs eight…
A: SOLUTION: NUMBER OF WORKERS 8 HOURLY WAGE $10 WORKING HOURS PER WEEK 45 PRODUCTION…
Q: Fritz makes custom chocolate portraits of dogs and sells them online. He is trying to figure out how…
A: The total revenue earned from selling a good or service equals its price multiplied by its quantity…
Q: A chair manufacturer who produces three different models ( A,B and C) has developed a master…
A: Given information Week No 1 2 3 4 5 A 200 0 200 0 100 B 0 0 0 200 100 C 100 300 100…
Q: A recently hired chief executive officer wants to reduce future production costs to improve the…
A: THE ANSWER IS AS BELOW:
Q: Q1) A company produces two products A and B. These products put in bottles. Product A is not more…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: 5 A ) A small office has 4, 4-lamp fixtures. It takes 45 minutes to clean and re-lamp the entire…
A:
Q: Northern Engineering is analyzing a mining project. Annual production, unit costs, and unit revenues…
A: Total Cost = Annual Production * Cost per ton Total Revenue = Annual Production * price per ton
Q: A process has high fixed costs and low variable costs. It is currently capacityconstrained. Will the…
A: The business's capacity is the maximum amount of work a business can perform in a given time.…
Q: Mack’s guitar fabrication shop produces low-cost, highly durable guitars for beginners. Typically,…
A:
Q: Sailmaster makes high-performance sails for competitive windsurfers. Below is information about the…
A: The formula for calculating productivity in sales revenue/labor cost is as follows:
Q: The senior management at Davis Watercraft would like to determine if it is possible to improve firm…
A: Given data, Model A B C Price $420 $320 $460 Material Cost $50 $30 $100 Weekly…
Q: a. Suppose the profit per table increases by $100. Will this change the optimal production…
A: : Since we only answer up to 3 sub-parts, we’ll answer the first 3. Please resubmit the question and…
Q: Which action should be taken according to a maximin criterion? only A O either A or B O only B O It…
A: Maximin criterion: Firstly, the minimum value from each decision alternative will be taken. Then the…
Q: 40 & 42
A: Note: First question was answered. Kindly post another question seperatelyDetermine the option that…
Q: #2.1] The setup from quiz 1 questions 4 & 5 is repeated below: "Consider software projects flowing…
A: The bottleneck process refers to the chain of project management, which reduces the capacity of the…
Q: On the average, a firm has an 8-week lead time for work-in-process, and annual cost of goods sold is…
A: Work in process is the total of all expenses incurr in production process to manufacture partially…
Q: If the cost of direct material is 60%, direct labor is 10%, and overhead is 25% of sales, what will…
A: Given data is Cost of direct material = 60% Direct labor = 10% Overhead cost = 25% Reduction in…
Q: XYZ makes two types of products using 4 machines for 8 hours each day. Product A visits machines 1,…
A:
Q: You are the operations manager for Louisiana Oysters, Inc. The company has designed new "Oyster…
A: Breakeven crossover identify the range of units each of the model required to deliver more profit.…
Q: Stackhouse Computing produces high-performance desktop computers. Labor cost data show that…
A: Given that, Total cost = $1,000,000 Number of computers produced = 5,000
Q: The following processes - Tameka, Tamia, and Christian - have the following cost structure: Show…
A: a) As we can see, the most economical process for volume of 8000 units is Christian having $116000…
Q: Which of the following is the correct value for the resulting line's efficiency?
A: THE ANSWER IS AS BELOW:
Q: The senior management at Davis Watercraft would like to determine if it is possible to improve firm…
A: a) Model A B C Price $420 $320 $460 Material Cost $50 $30 $100…
Q: Rapid-Lube provides oil changes and lubes. The estimated number of oil changes for April and May are…
A: The estimated number of oil changes for April and May =3,600 and 4,000. Each oil change = 12 minutes…
Q: A manager faces peak (weekly) demand for one of her operations, but is not sure how long the peak…
A:
Q: Tribal Systems, Inc., is opening a new plant and has yet todecide on the type of process to employ.…
A: Given data Labour-intensive process = $10,000 Cost for labor = $14 More automated process = $50,000…
Q: Manufacturing Aggregate Planning. Manufacturers Inc. (MI) currently has a labor force of 10, which…
A: Small Introduction about Demand The request is a financial hypothesis that alludes to a consumer's…
Q: What happens to the target manpower if the labor content is doubled?a. The target manpower increases…
A: A correct option is an option - b). - The target manpower doubles. Target manpower is the number of…
#5 please
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 2 images
- 2 3. The seven-person maintenance function at a hospital performs both preventive and corrective maintenance on hundreds of items each month. All the workers are scheduled for 40 hours per week and there are four weeks in a month. It is the gool of the maintenance deportment to achieve 90% utilization with a mix of two-thirds preventive maintenance and one-third corrective moaintenance. How many hours each month are spent performing corrective maintenance if they achieve their 90% utilization and correct/preventive mix targets?A novelty coffee mug manufacturer produces 5 different designs that are sold at tourist information kiosks. The demand requirements for the com- 3. ing tourist season is as follows: Design Demand (units) 500 750 600 800 450 A B C DE The mugs can all be produced in the same workstations, but require different processing and setup times. The production information is in the following table: Design Batch Size (units) C D 50 50 50 50 50 Setup Time (hr/batch) Processing Time (hr/unit) 0.15 0.15 0.25 0.25 0.10 2.5 4 1.5 The company wants to produce all the required mugs in one four-week pe- riod. It currently operates workstations that work 8 hours per day, 5 days per week, with a capacity cushion of 20%. (a) Calculate the total time required to produce the mugs to meet the ex- pected demand.Problem 1: A company that processes fruits and vegetables is able to produce 400 cases of canned peaches in one and half hour with four workers. Each worker is paid 2 Rials per hour. What is labor productivity in terms of cases/hour, cases/rial?
- This year, Druehl, Inc., will produce 57,600hot water heaters at its plant in Delaware, in order to meetexpected global demand. To accomplish this, each laborer atthe plant will work 160 hours per month. If the labor produc-tivity at the plant is 0.15 hot water heaters per labor-hour,how many laborers are employed at the plant?l AT&T ? C 2:01 PM ... mple Practice Math Flov Sample 1 You have an upstream Picking department that feeds two downstream packing departments: A and B. 75% of your Pick volume goes to department A, which has a packing rate of 150 units per labor hour (uph). 25% of the Pick volume goes to department B, which is for large items, and has a pack rate of 25 units per labor hour. Your pickers pick both large and small items throughout the day at an overall average rate of 100 units per labor hour. You have 25 people today for all 3 departments, and you absolutely must pack 7,500 units in department A to meet a customer promise metric. How do you allocate labor to balance the flow in your department if you work a 10 hour shift? Do not assume breaks or lunches in your answer Department % of Rate Реople Daily volume| (uph) volume Pick 100% 100 Pick A 75% 150 ? 7,500 Pick B 25% 25 ?Problem 9 A company that processes fruits and vegetables is able to produce 500 cases of canned peaches in one-half hour with four workers. Each worker is paid 4 Rials per hour. What is the change in labor hours if output remains the same and the labor productivity in terms of cases/hour increased by 50%?
- Barry’s Brakes is looking to hire workers to assemble the brake assemblies it produces. Barry has estimated total output of these workers can produce, see the table below. Barry will sell each brake assembly for $200 but the parts cost $160 for each assembly. Number of Workers Total Output (per day) 1 15 2 28 3 38 4 43 The hourly wage for factory workers is $275 per day. How many workers should the factory manager hire ?20. Manufacturing is often subject to a higher degree of variability of inputs than Service operations. AT 6. F gis1. Nasrin, Rashed and Tahmid run a Chocolate manufacturing company. Their productionruns 30-hour per week and they pay $6 per hour to their labors. Material cost is $3.5 per lbs.Machine productivity is 2.5 times weekly labor cost. Overhead is $300 per week. The weeklyproductivity figures are given below:Weeks Output (Units) Labors Material (lbs)1 1400 8 362 1500 9 343 1250 6 334 1300 7 35 a) Compute multi-factor productivity of machine and material for each of the monthsshown for their Chocolate manufacturing firm.b) Compute multi-factor productivity of Labor and Overhead for each of the months shownfor their Chocolate manufacturing firm.c) Compute total productivity measure for each of the months shown for their Chocolatemanufacturing firm.d) What do the productivity figures suggest? undefined
- 3. High carbon steel or alloy steel can be used for the set of tools on a lathe The tools must be sharpened periodically. Data for each are as follows High carbon steel 60 pcs 4 hours Alloy stee! 70 pcs 6 hours Output per hour Time between tool grinds Time required to change 1 hour tools The wage of the lathe operator is Php50 per hour, based on actual working hours. The total changer costs Php60 per hour Overhead costs for the lathe are Php15 per hour, includng tool-change time A set of unsharpened alloy steel costs Php880 and can be ground five times. What type of steel shoukd be used? I hourThe volume of raw materials required for a certain machine part is 2.02 cm3. The finished volume is 1.05cm3. The time for machining each pieces is 45 seconds for steel & 30 seconds for brass. The costs of steel P32.50/kg & the value for steel scrap is negligible. The cost of the brass is P60.00/kg & the value of brass scrap is P25.00/kg. The wage of the worker is P40/hr & the overhead cost of the machine is P50.00/hr. The weight of steel & brass are 0.0081 kg & 0.0088 kg per cm3 respectively. Which material will you recommend?Problem Answer ALL questions from this section. Write your answers on the supplied answer sheet. Show sufficient work. If necessary, round intermediate calculations and final answers to three decimal places. J 1. The manager of a crew that installs carpeting has tracked the crew's output over the past several we eks, obtaining these figures: Week 10 20 30 43 50 6 Crew Size تمه 30 45 Yards Installed 96- 72- 92- 50, 699 52- 20 39 2₂ Compute the labor productivity for each of the weeks. On the basis of your calculations, what can you conclude about crew size and productivity?