4-2 Final Project Milestone Two: Approach Selection – Decision Paper
QSO-435 Adaptive Project Mgmt
April 3, 2024
2
Project Management (PM) Approaches
Alternative project management approaches include traditional (waterfall), Agile, Scum, and Kanban. Each possesses distinct principles and processes to guide a project manager (PM) to complete a project successfully.
Waterfall Project Management
is a traditional project management method led by a PM involving a linear and sequential development model (Cobb, 2023). This development work is done in consecutive phases, each highly dependent on the one before completion.
The benefits of using this model are that it provides a clear structure and disciplined ways
to reach a common goal. Milestones and deadlines are clearly defined in this approach. The waterfall approach is intuitive if the project is straightforward. Consequently, this disciplined and structured approach is one of the most significant risks in this project management as it does not allow any changes to previous phases when the work is finished. Discovered design flaws cannot be addressed, resulting in another project or starting from scratch. Delayed testing is another risk with this approach, as testing is performed in the last half of the project, resulting in delays or costly changes.
Agile Project Management
is an adaptable approach that involves managing a complex project and breaking it down into small parts. It provides more freedom for incremental changes. Adaptability is a significant benefit of this project management approach. This approach also focuses on value, so there is constant collaboration and communication to ensure continuous improvement. Although this approach seems ideal, it does have its own set of risks. Agile is based on the idea that the result may not be known, so it is a challenge to determine the time, resources, and costs required. Documentation is also limited so that vital details can be missed or fall to the back burner. Lastly, with minimal
3
planning and only sometimes a clear vision of the end product, this approach could have no finite end, leading to additional time, resources, and costs for a project.
Scrum
Project Management
involves using sprints to achieve projects in small pieces. This project management approach is a mostly pull process that ensures teams can deliver
quickly and efficiently as it divides larger projects into manageable parts (Cobb, 2023). These short sprints ensure feedback from stakeholders is received faster, allowing for changes to be implemented more efficiently, resulting in collaboration, more communication with stakeholders, and more project visibility. Risks with this approach can result in a fragmented output. Since teams are working on components at different sprints, a complete output would be divided or incomplete rather than one cohesive unit. Although continuous changes are welcomed in this approach, it could lead to scope creep
since no defined end dates exist. Regarding team members in Scrum, daily meetings can cause frustrations, and if a team member leaves a mid-project, it could result in negative project impacts.
Kanban Project Management
is a pull process that focuses on the number of tasks/works in progress and attempts to reduce or streamline them (Cobb, 2023). This approach helps visualize and provide transparency on work. Using Kanban can help pinpoint bottlenecks and give insight into team members' workloads so they can adjust as necessary. It can aid in reducing distractions and improve concentration as it is clear who is responsible for what. Human factors are some of the significant risks within Kanban project management. Boards must be kept up-to-date and straightforward. They should be adequately maintained and manageable for the team, as issues could impact team efficiency and prove counterproductive.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
Program/Project Management PMO - Project Governance Summary and overview.
arrow_forward
A recent survey by IBM of 585 mobile application developed and managers found that only one-thir of mobile development projects successfully Mey project criteria in terms of budget, schedule, and project objectives. Given that, what are some of the potential Riska for companoes, such as FIMC, that develop and deploy a mobile app on such a tight schedule
arrow_forward
N5
Explain some of the basic principles of cost management, such as profits, life cycle costs, tangible and intangible costs and benefits, direct and indirect costs, and reserves. Why is defining activities a process of project time management instead of project scope management?
arrow_forward
Project manager manage project budget in project-oriented organization.
1-TRUE
2-FALSE
arrow_forward
Use the information in this table to calculate the weighted score for project 2
Criteria
Weight
Project1
Project2
Project3
Project4
Supports of key business objectives
5%
90
90
50
20
Has strong internal sponsor
10%
70
90
50
20
Has strong customer support
5%
50
90
50
20
Realistic level of technology
10%
25
90
50
70
Can be implemented in one year or less
30%
20
20
50
90
Provides positive NPV
10%
50
70
50
50
Has low risk in meeting scope, time, and cost goals
30%
20
50
50
90
arrow_forward
Define Project Scope, Project Deliverable and Project Scope Management.
Explain SIX (6) steps for Project Scope Management Processes.
Explain THREE (3) methods for collecting requirement in Project Scope Management.
arrow_forward
Project Scope Management
Khan, (2006) (see below) states that, "Managing the scope of a project is the most important function of a project manager ... Effective scope management of a project also ensures the success of key completion areas, including time, cost, and quality.
Project scope management can be further subdivided into its components which include: project initiation, scope planning, scope definition, scope verification, and scope change control."
Based on your Integrated Project:
Select two of the subdivisions above and discuss the primary issues that could arise from the process.
Your response should begin with a definition of the selected subdivision before detailing the selected process
arrow_forward
Q)Project can involve a single individual or multiple individuals, a single
organizational unit, or multiple organizational units from multiple organizations and
a project can create following: (Discuss this argument )
Subject :: project management
arrow_forward
There are 11 project selection methods which are: Benefit measurement methodsBenefit/cost ratioEconomic modelScoring modelPayback periodNet present valueDiscounted cash flowInternal rate of returnOpportunity costConstrained optimization methodsNon-financial considerations.
Which one of these techniques or methods are used in construction projects for the benefit of citizens?
arrow_forward
IFS233
Donell Consulting recently completed an IT training platform implementation with a public firm.
The project concluded after the completion of a testing, piloting and sign-off from the project
stakeholders. Though completed, the project manager was reviewing their notes, in which they
listed all the important occurrences that were recorded during various project phases:
●
The pilot of the training platform is about to begin, and the COO of the firm has informed the
project team that they want an additional 1000 staff trained and included, and the firm will be
increasing budget accordingly.
The new systems analyst replacement just found an issue with the way in which the training
platform is recording information inputted from users. Apparently, it does note read or collate
all the metadata produced during user inputs, and only considers metadata that leads to a
complete sequence of inputs. This is going to cause issues in how we record the users' activities
as the client wants to…
arrow_forward
Managing and controlling scope changes affects project deliveries. Discuss change management and ways to reduce project scope changes.
arrow_forward
Project Management
3. Jamaica's Highway 2000 project: Identify and justify the project development approach used for the project. Was it agile, waterfall/traditional or hybrid.
4. Was the Jamaica's Highway 2000 project selection method benefits measurements method or constraint optimization method.
arrow_forward
Roger Ginde is developing a program in supply chain management certification for managers. Ginde has listed a number of activities that must be completed before a training program of this nature
could be conducted. The activities, immediate predecessors, and times appear in the accompanying table:
Activity Immediate Predecessor(s)
A
BCDEFG
с
This exercise contains only parts b, c, and d.
b) The critical activities for the leadership training program development project are
c) The project length for the leadership training program development project =
d) Slack time for each of the activities is:
days.
Activity
A
B
C
ס ח ד 0
F
B
A, D
C
E, F
G
Slack Time
Time (days)
4
6
1
103510
arrow_forward
Roger Ginde is developing a program in supply chain management certification for managers. Ginde has listed a number of activities that must be completed before a training program of this
nature could be conducted. The activities, immediate predecessors, and times appear in the accompanying table:
Activity Immediate Predecessor(s)
A
(BCDEFG
This exercise contains only parts b, c, and d.
b) The critical activities for the leadership training program development project are
c) The project length for the leadership training program development project =
d) Slack time for each of the activities is:
days.
B
A, D
с
E, F
Activity
A
B
CDEFG
Slack Time
Time (days)
3
GANGG
5
2
10
4
8
arrow_forward
Use the following project status information to calculate each of the requested EVM numbers below (a-i).The project status is reported at the end of week 13.
Task Budget Cost Budget Duration Status as of Week 13
A $5,000 2 Weeks 100 percent complete $5,000B $8,500 3 Weeks 100 percent complete $9,000C $15,000 4 Weeks 75 percent complete $14,000D $10,000 4 Weeks 50 percent complete $9,000 E $12,000 4 Weeks Not startedF $15,000 5 Weeks Not started
a. Planned Valuedb. Actual costc. Cost varianced. Schedule variancee. Cost performance indexf. Schedule performance indexg. Budget at completionh. Estimation to completei. Estimation at completion
arrow_forward
which of the following are valid project selection methods
A. Holy Goat
B. The unbalanced program method
C. The weighted scoring method
D. Personal prference
arrow_forward
scenarios of a project activities (tables given below) and their required times to be completed in
addition to their predecessors for developing a Website' :
Activity
Description
Duration (days)
Preceding Activities
A
Determine user needs
8
Review s/w and languages
Purchase software
10
Design format and style
10
E
Write programs
A
F
Review outcome product with user
12
G
Make revisions
4
C
H
Select server site
E
I
Install on server
14
D, F
Test
G, H, I
3. Highlight the total time to complete the project (days)
4. Calculate the late finishing time (backwards calculations)
arrow_forward
Q1. Using a suitable example each, describe what the following project planning
process activities involve:
a. Establish project objective;
b. Define scope;
c. Create a Work Breakdown Structure (WBS);
d. Estimate activity durations;
e. Sequencing activities.
arrow_forward
The activities involved in a project are listed in the following table. Construct the project
network and use CPMto find the critical path
Ac tivity Content
Predece ssor(s) Duration (days)
A
Initial research
B
Studysite selection
Prepare research plan
Contact the surveysite
Training staff
Prepare the form
Field re search
Write the re search report
Meeting Summary
A
2
A
4
B
2
E
B, C
3
F
C
1
G
D, E, F
G
5
2
I
H
3
arrow_forward
What roles do traditional process management duties of planning, organizing, and controlling play in project management?
arrow_forward
Identify the critical path for the following three scenarios of a project activities (tables given
below) and their required times to be completed in addition to their predecessors for developing
a Website':
Activity
Description
Duration (weeks)
Preceding Activities
A
Determine user needs
3
Review s/w and languages
1
C
Purchase software
4
D
Design format and style
4
B
E
Write programs
A
F
Review outcome product with user
C
G
Make revisions
1
D, F
H
Select server site
3
E
I
Install on server and test
6.
G
J
3
Н, I
1. Draw the path.
2. Calculate the early finishing time (forwards calculations)
3. Highlight the total time to complete the project (weeks)
4. Calculate the late finishing time (backwards calculations)
5. Calculate the slack time of the non-critical path activities
6. Identify the critical path (highlight critical path activities)
arrow_forward
8 EARNED VALUE ANALYSIS
The following project is reported to be at the end of its 8 week. Find the cost and schedule variances.
Also find the CPI, SPI, CSI, ETC and EAC for the project. Find the condition of the project at the this reporting period.
PV
AC
Budget
($)
Duration
Actual Cost
%
D-8
Activity Predecessor (s)
(week)
($)
Complete
300
400
A
3
100
A3
В
4
200
180
100
B:4
C
7
250
300
90
A
8
600
400
50
400
200
В
40
150
180
F
В
4
100
G
C
4
100
200
40
500
H
D, E
2
300
F, G
3
J
H, I
1
100
ㅇ
CO
프
(-)
arrow_forward
Which project life cycle model (traditional, agile...) is more appropriate for the public and/or private sector?
arrow_forward
List two outputs for each of the Project Risk Management processes (note that the Implement Risk Responses process is not discussed in this chapter)
arrow_forward
Project Duration=
Planning on spending per month
Project Budget (BAC)
Percent complete per month
Performance Analysis
% Complete
Planned Value (PV)
Actual Cost (AC)
Earned Value (EV)
Schedule Variance (SV)
Schedule Performance Index (SPI)
Cost Variance (CV)
Cost Performance Index (CPI)
Estimate at Completion (EAC)
Estimate to Complete (ETC)
Variance at Completion (VAC)
5 months
$300,000.00
$1,500,000.00
Month 1
20%
20% of work completed
15% of work completed
Spent additional $110,000
Month 2
Instructions: Utilizing the EVM cheat sheet provided by the instructor, complete the calculations i
formulas and functions to attain your answers. Please do not simply plug in numbers. This exerci
ability to use Excel. Finally, answer the questions below to explain your answers.
Question 1: What do your SV numbers tell you about the project schedule and how?
Answer 1:
Question 2: What do your SPI numbers tell you about the project schedule and how?
Answer 2:
arrow_forward
Earned value analysis is the project management tool that is used to measure project progress.
You are a project manager in company XYZ that responsible to handling the packaging machine
project with the total cost budgeting is RM100,000. There are including RM24,000 (Design),
RM60,000 (build) and RM16,000 (install & test). The information regarding on the project
progress development in weeks 8 as shown in Table 2 below:
No
Type
Cumulative Budgeted Cost (CBC)
2 Cumulative Actual Cost (CAC)
Cumulative Earned Value (CEV)
1
3
TOTAL
RM
i.
ii.
iii.
iv.
64,000
68,000
54,000
100,000
Percentage
64.0
Cost performance Index (CPI) [hint: CEV/CAC]
Cost variance (VC) [hint: CEV-CAC]
68.0
54.0
a) Based on question 2(a), calculate and elaborate the various of indicators of cost
performance for this project based on the respective below:
100.0
Forecasted cost of completion (FCAC) with action taken [hint: TBC/CPI]
Forecasted cost of completion (FCAC) without any action taken
[hint: CAC + [TBC-CEV]
arrow_forward
The triple constraints of project management include:
O A. Risk, Scope and quality
O B. WBS, Scope and deliverables
O C. Cost, quality and communication
O D. Cost, time and scope
arrow_forward
How can project managers ensure that the project deliverables meet the client's requirements in a time and cost-constrained project?
arrow_forward
he project charter involves several elements including, the project manager and project title. Use suitable examples to explain any other five elements of the project charter
Milestone schedule
Key assumptions
Constraints
Major risks
arrow_forward
a. Introduction PPE GLOVEb. Objective of Project/Manufacturing Processc. History of Company/Product (PPE GLOVE)
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Understanding Business
Management
ISBN:9781259929434
Author:William Nickels
Publisher:McGraw-Hill Education
Management (14th Edition)
Management
ISBN:9780134527604
Author:Stephen P. Robbins, Mary A. Coulter
Publisher:PEARSON
Spreadsheet Modeling & Decision Analysis: A Pract...
Management
ISBN:9781305947412
Author:Cliff Ragsdale
Publisher:Cengage Learning
Management Information Systems: Managing The Digi...
Management
ISBN:9780135191798
Author:Kenneth C. Laudon, Jane P. Laudon
Publisher:PEARSON
Business Essentials (12th Edition) (What's New in...
Management
ISBN:9780134728391
Author:Ronald J. Ebert, Ricky W. Griffin
Publisher:PEARSON
Fundamentals of Management (10th Edition)
Management
ISBN:9780134237473
Author:Stephen P. Robbins, Mary A. Coulter, David A. De Cenzo
Publisher:PEARSON
Related Questions
- Program/Project Management PMO - Project Governance Summary and overview.arrow_forwardA recent survey by IBM of 585 mobile application developed and managers found that only one-thir of mobile development projects successfully Mey project criteria in terms of budget, schedule, and project objectives. Given that, what are some of the potential Riska for companoes, such as FIMC, that develop and deploy a mobile app on such a tight schedulearrow_forwardN5 Explain some of the basic principles of cost management, such as profits, life cycle costs, tangible and intangible costs and benefits, direct and indirect costs, and reserves. Why is defining activities a process of project time management instead of project scope management?arrow_forward
- Project manager manage project budget in project-oriented organization. 1-TRUE 2-FALSEarrow_forwardUse the information in this table to calculate the weighted score for project 2 Criteria Weight Project1 Project2 Project3 Project4 Supports of key business objectives 5% 90 90 50 20 Has strong internal sponsor 10% 70 90 50 20 Has strong customer support 5% 50 90 50 20 Realistic level of technology 10% 25 90 50 70 Can be implemented in one year or less 30% 20 20 50 90 Provides positive NPV 10% 50 70 50 50 Has low risk in meeting scope, time, and cost goals 30% 20 50 50 90arrow_forwardDefine Project Scope, Project Deliverable and Project Scope Management. Explain SIX (6) steps for Project Scope Management Processes. Explain THREE (3) methods for collecting requirement in Project Scope Management.arrow_forward
- Project Scope Management Khan, (2006) (see below) states that, "Managing the scope of a project is the most important function of a project manager ... Effective scope management of a project also ensures the success of key completion areas, including time, cost, and quality. Project scope management can be further subdivided into its components which include: project initiation, scope planning, scope definition, scope verification, and scope change control." Based on your Integrated Project: Select two of the subdivisions above and discuss the primary issues that could arise from the process. Your response should begin with a definition of the selected subdivision before detailing the selected processarrow_forwardQ)Project can involve a single individual or multiple individuals, a single organizational unit, or multiple organizational units from multiple organizations and a project can create following: (Discuss this argument ) Subject :: project managementarrow_forwardThere are 11 project selection methods which are: Benefit measurement methodsBenefit/cost ratioEconomic modelScoring modelPayback periodNet present valueDiscounted cash flowInternal rate of returnOpportunity costConstrained optimization methodsNon-financial considerations. Which one of these techniques or methods are used in construction projects for the benefit of citizens?arrow_forward
- IFS233 Donell Consulting recently completed an IT training platform implementation with a public firm. The project concluded after the completion of a testing, piloting and sign-off from the project stakeholders. Though completed, the project manager was reviewing their notes, in which they listed all the important occurrences that were recorded during various project phases: ● The pilot of the training platform is about to begin, and the COO of the firm has informed the project team that they want an additional 1000 staff trained and included, and the firm will be increasing budget accordingly. The new systems analyst replacement just found an issue with the way in which the training platform is recording information inputted from users. Apparently, it does note read or collate all the metadata produced during user inputs, and only considers metadata that leads to a complete sequence of inputs. This is going to cause issues in how we record the users' activities as the client wants to…arrow_forwardManaging and controlling scope changes affects project deliveries. Discuss change management and ways to reduce project scope changes.arrow_forwardProject Management 3. Jamaica's Highway 2000 project: Identify and justify the project development approach used for the project. Was it agile, waterfall/traditional or hybrid. 4. Was the Jamaica's Highway 2000 project selection method benefits measurements method or constraint optimization method.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Understanding BusinessManagementISBN:9781259929434Author:William NickelsPublisher:McGraw-Hill EducationManagement (14th Edition)ManagementISBN:9780134527604Author:Stephen P. Robbins, Mary A. CoulterPublisher:PEARSONSpreadsheet Modeling & Decision Analysis: A Pract...ManagementISBN:9781305947412Author:Cliff RagsdalePublisher:Cengage Learning
- Management Information Systems: Managing The Digi...ManagementISBN:9780135191798Author:Kenneth C. Laudon, Jane P. LaudonPublisher:PEARSONBusiness Essentials (12th Edition) (What's New in...ManagementISBN:9780134728391Author:Ronald J. Ebert, Ricky W. GriffinPublisher:PEARSONFundamentals of Management (10th Edition)ManagementISBN:9780134237473Author:Stephen P. Robbins, Mary A. Coulter, David A. De CenzoPublisher:PEARSON
Understanding Business
Management
ISBN:9781259929434
Author:William Nickels
Publisher:McGraw-Hill Education
Management (14th Edition)
Management
ISBN:9780134527604
Author:Stephen P. Robbins, Mary A. Coulter
Publisher:PEARSON
Spreadsheet Modeling & Decision Analysis: A Pract...
Management
ISBN:9781305947412
Author:Cliff Ragsdale
Publisher:Cengage Learning
Management Information Systems: Managing The Digi...
Management
ISBN:9780135191798
Author:Kenneth C. Laudon, Jane P. Laudon
Publisher:PEARSON
Business Essentials (12th Edition) (What's New in...
Management
ISBN:9780134728391
Author:Ronald J. Ebert, Ricky W. Griffin
Publisher:PEARSON
Fundamentals of Management (10th Edition)
Management
ISBN:9780134237473
Author:Stephen P. Robbins, Mary A. Coulter, David A. De Cenzo
Publisher:PEARSON