T
EAM
MEMBERS
S
TUDENT
N
UMBER
S
TUDENT
NAME
12042076
OMNATH SHRESTHA
12040331
ASMA ALAM AFRIN
12042080
NILESH CHHAGAN DODHWADIYA
12041187
ANSHUL RIMAL
12040557
YASHMEEN RAI
472eba7e954c7c1fc1f2934efd8be3bc89bb08ff.docx
Risk Management Report
(2)
Table of Contents
4.0
R
ISK
C
ONTROL
.....................................................................................................
0
4.1
I
NTEGRATE
RISK
CONTROL
PLAN
.............................................................................
0
4.2
R
ISK
MITIGATION
/ CONTROL
STRATEGIES
USING
H
IERARCHY
OF
CONTROL
......................
1
4.3
R
ESOURCES
TO
ENSURE
RISK
CONTROL
PLAN
/ STRATEGIES
ARE
IMPLEMENTED
................
4
4.4
A
CTION
PLAN
FOR
IMPLEMENTING
RISK
CONTROL
.......................................................
5
4.4.1
E
VALUATING
THE
EFFECTIVENESS
OF
RISK
CONTROLS
.................................................
6
T
EAM
P
LANNING
...............................................................................................................
7
472eba7e954c7c1fc1f2934efd8be3bc89bb08ff.docx
4.0Risk Control 4.1
Integrate risk control plan
a)
Identify your hazards from the previous part of the report.
b)
Include your original risk ranking.
c)
Include your priority you assigned. d)
Select the controls you think will reduce the risk
Hazard
Risk Rating
Priority
Hierarchy control methods Selected
H
M
L
Eliminatio
n
Substitutio
n
Engineeri
ng
Administr
ative PPE
1.
Broken ceiling on the classes
High
☒
☐
☐
☐
☐
☒
☐
☐
2.
Missing First-aid items
Low
☐
☐
☒
☐
☐
☐
☐
☒
3.
Unmanaged Cables
Medium
☐
☒
☐
☒
☒
☐
☐
☐
472eba7e954c7c1fc1f2934efd8be3bc89bb08ff.docx
Page 2
of 15
472eba7e954c7c1fc1f2934efd8be3bc89bb08ff.docx
Page 3
of 15
4.2
Risk mitigation / control strategies using Hierarchy of control
For each of your hazards (minimum 3) you need to provide supporting information on your selection of control/s and identify at least one limitation for each of your selected controls Hazard Identified
Broken ceiling on the classes
1
Control/s Selected
Elimination
Substitution
Engineering
Administrative
controls
PPE
☐
☐
☒
☐
☐
Control
Explanation to support selection
Limitations of the control
Elimination
Substitution
Engineering
Contact the engineering contractors to fix the ceiling as soon as possible. As contractors must be contacted, this will take time to fix.
Administrative controls
PPE
472eba7e954c7c1fc1f2934efd8be3bc89bb08ff.docx
Page 4
of 15
For each of your hazards (minimum 3) you need to provide supporting information on your selection of control/s and identify at least one limitation for each of your selected controls Hazard Identified
Missing First-aid items
2
Control/s Selected
Elimination
Substitution
Engineering
Administrative
controls
PPE
☐
☐
☐
☐
☒
Control
Explanation to support selection
Limitations of the control
Elimination
Substitution
Engineering
Administrative controls
PPE
Safety hats were missing, which are required as per the Work Health and Safety Law. They should buy the missing hats.
They must follow the company’s procedure for replacements. They must communicate with relevant authorities which might be time consuming.
472eba7e954c7c1fc1f2934efd8be3bc89bb08ff.docx
Page 5
of 15
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help