CH 6 Study Guide

.docx

School

Central Washington University *

*We aren’t endorsed by this school

Course

320

Subject

Industrial Engineering

Date

Apr 3, 2024

Type

docx

Pages

4

Uploaded by JusticeKouprey17715 on coursehero.com

Study Guide for Chapter 6 1. Which of the following are key organizational data relevant to the production process? (2 Correct answers) Purchasing Organization   Credit control area   Work center   Storage location   Plant   Bill of material 2. Master data relevant to the production process are (3 Correct answers)   Work centers   Material master   Bills of material   Client   Company code   Production order 3. Which of the following are statuses that can apply to a BOM? (2 Correct answers)   On   Off   Active   Inactive   Open 4. Which of the following can be included in processing time? (2 Correct answers)   Machine time   Configuring work center   Configuring equipment   Labor time   Setup time 1
5. Examples of production resource tools are (3 Correct answers)   Raw materials   Fixtures   Engineering drawings   Calibration instruments   Warehouse building 6. A planned order is a formal request that indicates (3 Correct answers)   How many units of a material are needed   Where the finished goods are to be shipped   What materials are needed   Where the raw materials are stored   When the materials are needed 7. Which one of the following is NOT a type of organizational data relevant to the production process?   Company code   Credit control area   Client   Storage location   Plant 8. Which one of the following best describes a work center?   A location where materials are placed right before they are shipped   Another term used to describe an office building   A location where value-added work needed to produce a material is carried out   A shipping dock   A storage shelf in a warehouse 9. All of the following can serve as a work center except   A group of machines   A group of people responsible for completing operations   A production line   A work area   A shipping dock 10. Which of the following identifies the list of materials needed to produce one or more units of a finished good?   Routing 2
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help