TMLT311 quiz 3

.docx

School

American Public University *

*We aren’t endorsed by this school

Course

311

Subject

Aerospace Engineering

Date

Apr 3, 2024

Type

docx

Pages

4

Uploaded by sad3sat on coursehero.com

Question 1 0.3 / 0.300000012 points Recently how many people people died when a ship collided with an oil platform in the Bombay High oil field area, sparking a fire that gutted a rig that produced one sixth of India's oil? Question options: 1200 120 12 12,000 Question 2 0 / 0.300000012 points There are about how many offshore platforms around the globe and many onshore? Question options: 60,000 6,000 600 60 Hide question 2 feedback Urso Production facilities para Question 3 0.3 / 0.300000012 points Generally, there are how many industry standards or norms for an integrated safety and security solution applied within the oil and gas supply chain? Question options:
Many Very Few No Too many to count Question 4 0.3 / 0.300000012 points In the Smith reading, how long did the project take? Question options: 1.5 years 2.5 years 1 year 1.75 years Question 5 0.3 / 0.300000012 points What is a professional corporation offering a comprehensive range of consulting services in applied earth and environmental sciences, including geotechnical and environmental engineering, construction materials testing, geophysics and drilling? Question options: Geptechnology Gentechnology Gertechnology Geotechnology Question 6 0.3 / 0.300000012 points According to Smith's (2010) article Logistics is key during pre-design for linear pipeline , "Geotechnical subsurface exploration involved drilling borings at Geotechnical subsurface exploration involved drilling borings at
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help